Selkirk College
Project: Replacement of the existing heating, ventilation and air conditioning system to improve energy efficiency and allow summer programming
Total Project Cost:
$1,876,250
Total KIP Funding:
$926,250
Status of Project: Substantially completed
Project Description
This project involves replacement of the heating, ventilation and air conditioning system. The new system is comprised of a chilled-water cooling system, which is being added to three buildings that did not previously have cooling. The upgrade involves removing the roof structure from three rooftop mechanical penthouses located on each building and removing the mechanical equipment.
Primary Areas of Benefit
- Expands or enhances utility of training space: This project improves cooling of campus facilities, enabling the institution to offer programs during the summer.
- Improves energy efficiency: This project reduces electricity consumption by 78 % and greenhouse gas emissions by 6 tonnes of CO2 per year.
- Date modified: