Project: Upgrade/renewal of building envelope systems to increase safety and energy consumption at Broadway and Downtown Campuses.

Total Project Cost:
$10,200,000
Total KIP Funding:
$4,241,250

Status of Project: Substantially completed

Project Description

This project involves renovating and updating the Broadway campus. Renovations include building repair, membrane replacement over underground building spaces, drainage tile installation and pipe replacement. Additional upgrades include replacing the 30-year-old boilers with new high-efficiency units.

Primary Areas of Benefit

  1. Improves energy efficiency: This project reduces emissions and increases energy efficiency by replacing 30-year-old boilers with high-efficiency units and replacing old leaking windows.
  2. Upgrades health and safety aspects of facilities: This project improves the health and safety of the facility by addressing the general deterioration of the buildings and by replacing leaking windows and skylights.