St. Peter's College

Project: Revitalization Initiative

Total Project Cost:
$12,072,000
Total KIP Funding:
$6,036,000

Status of Project: Substantially completed

Project Description

This project involves transforming current science labs into one integrated sciences lab equipped for chemistry, physics, biology, geography and related courses that meet the requirements of the health-care sector. Renovations include upgrades to the heating, ventilation and air conditioning, electrical and plumbing systems; the elevator; and stairways, doors, washrooms, interior and exterior walls, ceilings, floors and windows.

Primary Areas of Benefit

  1. Expands or enhances utility of training space: The renovated science labs and upgraded facility accommodate the anticipated increase in enrolment and additional 83 faculty and administrative and support staff.
  2. Improves energy efficiency: Installation of high-efficiency windows, doors and a heating, ventilation and air conditioning system reduces energy costs by 45 percent. In addition, upgraded washrooms and laboratories decrease water usage by 47 percent.

Photo Gallery

St. Peter's College, Revitalization Initiative September 2011
St. Peter's College, Revitalization Initiative July 2010
St. Peter's College, Revitalization Initiative June 2010
St. Peter's College, Revitalization Initiative June 2010
St. Peter's College, Revitalization Initiative March 2010
St. Peter's College, Revitalization Initiative December 2009
St. Peter's College, Revitalization Initiative December 2009
St. Peter's College, Revitalization Initiative December 2009