What’s New
Laws and Requirements: G-03 — Natural Gas Meters and Ancillary devices Qualified for a Lengthened Initial Reverification Period
2012-02-02
Laws and Requirements: E-28 — Qualification of Electricity Meters for Lengthened Initial Reverification Period of 10 years
2012-02-01
Information Bulletin: Minor Amendments Made to the Two Acts Administered by Measurement Canada
2012-01-23
Consultation: Specification for the Installation and Use of Electricity Meters Approved and Verified to be Used in Establishing Processed Legal Units of Measure (PLUM)
2012-01-23
Consultation: S-E-02 — Specifications for the Verification and the Reverification of Electricity Meters
2012-01-23
Laws and Requirements: S-EG-06 — Specifications Relating to Event Loggers for Electricity and Gas Metering Devices
2012-01-16
Laws and Requirements: S-EG-05 — Specifications for the Approval of Software Controlled Electricity and Gas Metering Devices
2012-01-16
Laws and Requirements: E-31 — Implementation of Recommendations on Volt-amperes and Legal Units of Measure
2012-01-12
Information Bulletin: Policy on the Use of Electronic Electricity Meters Programmed with the "Delivered Plus Received" Energy Function
2012-01-06
Laws and Requirements: S-01 — Implementation Guide for the Application of Statistical Sampling Requirements
2012-01-05
Laws and Requirements: P-S-04-A — Model Procedure for Sampling Inspection of Isolated Lots
2012-01-05
Laws and Requirements: P-S-04-B — Model Procedure for Sampling Inspection of Short Series of Lots
2012-01-05
Laws and Requirements: EL-ENG-09 — Procedures and Guidelines for the Measurement Uncertainty Determination of Electricity Meters and Consoles
2011-12-05
Laws and Requirements: GEN-40 — Application and Implementation of Measurement Canada's Specifications for the Approval of both Software Controlled Electricity and Gas Meters and Event Loggers
2011-11-23
For older news, consult the news archive
