E-14 — Conditional Permission for Leaving a Meter in Service without Reverification

E-14—Conditional Permission for Leaving a Meter in Service without Reverification (PDF, 11 KB, 2 pages)


Date: 1995-05-15
Bulletin: E-14-E
Category: Electricity
Supersedes: CEG-95-04
Document(s): EGI Act, section 12


1. Under the authority of sub-section 12(1)(c) of the Electricity and Gas Inspection Act, permission is hereby granted for leaving in service without reverification the interbases covered under the following approvals:

Notice of Approval Applicant
E-235 Hydro-Québec
E-236 & E-236 ADD Hydro-Québec
E-237 Hydro-Québec
E-247 PSG Industries
E-249 Mors Technologies Inc.
E-251 Micro Controle Inc.
E-252 B.C. Checo International Ltd.
E-255 SPC Automation Inc.
E-265 Hydro-Québec

2. This permission is subject to the following:

2.1 this permission does not extend to the dual rate energy meter nor to the temperature probe which form integral parts of the bi-energie system; and

2.2 this permission may be withdrawn at such time as the Director deems necessary.

3. For additional information, please contact the Guy Dacquay, Program Officer, Electricity Measurement, Program Development Directorate.