E-28 — Qualification of Electricity Meters for Lengthened Initial Reverification Period of 10 years

E-28—Qualification of Electricity Meters for Lengthened Initial Reverification Period of 10 years (PDF, 86 KB, 19 pages)


Category: Electricity
Bulletin: E-28 (rev. 8)
Document(s): S-EG-01, S-S-05, E-26
Issue Date: 2013-01-01
Effective Date: 2013-01-01
Supersedes: E-28 (rev. 7)


Table of Contents


1.0 Purpose & Scope

The purpose of this bulletin is to officially communicate the electronic electricity meters that have been conditionally and unconditionally qualified for a 10-year initial reverification period pursuant to Measurement Canada specifications S-EG-01and S-S-05, and to communicate those meters that no longer qualify for a lengthened initial reverification period.

2.0 References

2.1 Electricity and Gas Inspection Act (R.S. 1985, c. E-4), s. 12.

2.2 Electricity and Gas Inspection Regulations (SOR/86-131), ss. 3(1), s. 19.

2.3 Specification S-EG-01–Electricity and Gas Meter Pattern Approval Applications–Quality and Measurement Reliability Information Requirements in Support of a Lengthened Initial Reverification Period

2.4 Specification S-S-05–Performance Requirements Applicable to Meters Granted a Conditionally Lengthened Initial Reverification Period under S-EG-01

3.0 Initial Reverification Period Tables

Table 1–Electricity Meters Qualified for an Unconditional 10 year Initial Reverification Period
Manufacturer Model(s) Approval No. Rating/Configuration Applicability
Itron
  • C1S (D, T, L and R model designations)
  • CN1S (D, T, L and R model designations)
  • CN1SX
  • C1SX
AE-0920
  • 1 element, 2 wire, single phase, 120 volts, 240 volt, 0.2-20, 0.25-100, 1.0-100 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 240 volts, 0.5-200, 2.0-200 amperes, 60 Hz
  • 2 element, 3 wire, network, 120 volts, 0.5-200, 2.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Itron
  • Sentinel
AE-1132
  • 1 element, 2 wire, single phase, 120 to 480 volts, 0.2-20 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120 to 480 volts, 0.5-200 amperes, 60 Hz
  • 2 element, 3 wire, network and single phase, 120 to 480 volts, 0.5-200 amperes, 60 Hz
  • 2 element, 3 wire, delta, 120 to 480 volts, 0.05-20, 0.5-200 amperes, 60 Hz
  • 2.5 element, 4 wire, Wye or delta, 120 to 480 volts, 0.2-20, 0.5-200 amperes, 60 Hz
  • 3.0 element, 4 wire, Wye or delta, 120 to 480 volts, 0.2-20, 0.375-150, 0.5-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Itron
  • CP1S (D, T, L and R model designations)
AE-1466
  • 3 element, 4 wire, Wye or delta, 120 to 480 volts, 0.02-20, 0.5 -200, 0.5-320 amperes, 60 Hz
  • 2 element, network, 3 wire, delta, 120 to 480 volts, 0.02-20, 0.5-200, 0.5-320 amperes, 60 Hz
  • 2.5 element, 4 wire, Wye, 120 to 480 volts, 0.02-20 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
General Electric Co.
  • KV2c
  • KV2c+
  • KV2e
  • KV2n
AE-1059
  • 1 element, 2 wire, single phase, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2 element, 3 wire, single phase, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, 120 to 480, 600 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, delta, 120 to 480, 600 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2.5 elements, 4 wire, Wye, 120 to 480 volts, 0.2-20 amperes, 60 Hz
  • 3 elements, 4 wire, Wye or delta, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
General Electric Co.
  • I-210
AE-1342
  • 2 wire, single phase, 120, 240 volts, 0.2-20, 1.0-100 amperes, 60 Hz
  • 3 wire, single phase , 240 volts, 0.2-20, 1.0-100, 2.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Elster Metering AE-0541
  • 2 elements, 3 wire, network. 96 to 528 volts, 0.1-20,
    1.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, delta, 96 to 528 volts, 0.1-20, 1.0-200 amperes, 60 Hz
  • 2.5 elements, 4 wire, Wye, 96 to 528 volts, 0.1-20, 1.0 -200 amperes, 60 Hz
  • 3 elements, 4 wire, Wye or delta, 96 to 528 volts, 0.1-20, 1.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Elster Metering AE-0580
  • 2 elements, 3 wire, network, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-100, 1.0-200 amperes,
    60 Hz
  • 2 elements, 3 wire, delta, 96 to 528 volts 0.1-10, 0.1-20, 1.0-100, 1.0-200 amperes, 60 Hz
  • 2 5 elements, 4 wire, Wye, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-100, 1.0-200 amperes, 60 Hz
  • 3 elements, 4 wire, Wye or delta, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-100, 1.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Elster Metering AE-0601
  • 1 element, 2 wire, single phase, 120 to 480, 240 volts, 0.1-20, 1.0-200 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120 to 480, 240 volts, 0.1-20, 1.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.

Elster
Metering

  • ALPHA 3
  • A3K
  • A3D
  • A3T
  • A3R

/(Q, L, N, C, A) Model designations

AE-1168
  • 1 elements, 2 wire, single phase, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-200 amperes, 60 Hz
  • 1.5 elements, 3 wire, single phase, 96 to 528 volts, 0.1-20, 1.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, delta, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-200 amperes, 60 Hz
  • 2.5 elements, 4 wire, Wye, 96 to 528 volts, 0.1-10, 0.1-20, amperes, 60 Hz
  • 3 elements, 4 wire, Wye, 96 to 528 volts, 0.1-10, 0.1-20, 1.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Elster Metering
  • REX
  • R1
  • RS
  • R1SD
AE-1320
  • 1 element, 2 wire, single phase, 120 to 240 volts,
    0.1-20, 1.0-200 amperes, 60 Hz
  • 1.5 elements, 3 wire, single phase, 120 to 240 volts, 0.1-20, 1.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network, 120 to 240 volts, 0.1-20, 1.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.

Landis + Gyr Inc.

  • Focus ALF
AE-1356
  • 1 element, 2 wire, single phase, 120, 240 volts, 0.1-10, 2.0-200 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120, 240 volts, 0.1-10, 2.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network, 120 volts, 2.0-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
TRIACTA Power Technologies
  • POWERHAWK 6320
AE-1434
  • 2 elements, 3 wire, single phase, network, 120 volts, 0.05 to 5 amperes, 2 to 200 amperes, 60 Hz
  • 3 elements, 4 wires Wye, 120 volts, 0.05 to 5 amperes, 2 to 200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Sensus Metering Systems Inc.
  • iCon
  • iCon Flexnet 530-X
  • iCon RadioRead 530-E MXU
AE-1145
  • Single phase, 3 wire, 120, 240 volts, 1-200 amperes, 60 Hz
  • 2 element, 3 wire, network, 120, 240 volts, 1-200 amperes, 60 Hz
Unconditional 10 year initial reverification period for all meters.
Table 2–Electricity Meters Qualified for a Conditional 10 year Initial Reverification Period
Manufacturer Model(s) Approval No. Rating/Configuration Applicability
Landis + Gyr Inc.
  • RXS4e
  • RXRS4e
  • AXS4e
  • AXLS4e
  • AXRS4e
AE-0764
  • 1 element, 2 wire, single phase, 120 to 480 volts, 0.1-10, 0.2-20, 2.0-200 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120 to 480 volts, 0.1-10, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network or delta, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2.5 elements, 4 wire, Wye or delta, 120 to 480 volts, 0.2-20 amperes, 60 Hz
  • 3 element, 4 wire, Wye or delta, 120 to 480 volts, 0.2-20, 2.0-200 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2008.

Sampling in accordance to S-S-05 required prior to June 2014.

Landis + Gyr Inc.
  • Focus II ALF
AE-1559
  • 1 element, 2 wire, single phase, 120, 240 volts, 0.1-10, 0.2-20, 2.0-200 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120, 240 volts, 0.1-10, 2.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network, 120 volts, 2.0-200 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2008.

Sampling in accordance to S-S-05 required prior to June 2014.

Elster Metering
  • REX2
  • R2S
  • R2SD
  • gREX
AE-1579
  • 1 element, 2 wire, single phase, 120, 240 volts, 0.1-10, 0.1-20, 1.0-100, 1.0-200 amperes, 60 Hz
  • 1.5 elements, 3 wire, single phase, 120, 240 volts, 0.1-10, 0.1-20, 1.0-100, 1.0-200 amperes, 60 Hz
  • 2 elements, 3 wire, network, 120 volts, 1.0-200 amperes, 60 Hz
  • 2 element, 3 wire, delta, 600 volts, 1.0-200 amperes, 60 Hz gREX:
  • 1 element, 2 wire, single phase, 120, 240 volts, 1.0-100 amperes, 60 Hz
  • 1.5 elements, 3 wire, single phase, 240 volts, 1.0-100 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2008.

Sampling in accordance to S-S-05 required prior to June 2014.

Itron

  • CVSO (D and R model designations)
AE-1498
  • 1.5 element, 3 wire, single phase, 240 volts, 0.5-200 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2007.

Sampling in accordance to S-S-05 required prior to June 2013.

General Electric Co.

  • I-210+
  • I-210+n
AE-1517
  • 2 wire, single phase, 120 volts, 0.2-20, 1.0-100 amperes, 60 Hz
  • 3 wire, single phase, 240 volts, 0.2-20, 2.0-200 amperes, 60 Hz
  • 2 element, 3 wire, network, 120 volts, 2.0-200 amperes, 60  Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2007.

Sampling in accordance to S-S-05 required prior to June 2013.

Sensus Metering Systems Inc
  • iSA2 with Flexnet 530-X
AE-1611
  • 2 wire, single phase, 120, 240 volts, 0.2-20, 1.0-200 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 120, 240 volts, 0.2-20, 1-200 amperes, 60 Hz
  • 2 element, 3 wire, network, 120, 240 volts, 1-200 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2009.

Sampling in accordance to S-S-05 required prior to June 2015.

Itron
  • C2SO
  • C2SOD
  • CN2SO
  • CN2SOD
AE-1631
  • 1 element, 2 wire, single phase, 120 volts, 0.25-100, 0.5-200 amperes, 60 Hz
  • 1.5 elements, 3 wire, single phase, 240 volts, 0.5-200 amperes, 60 Hz
  • 2.0 elements, 3 wire, network, 120 volts, 0.5-200 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2011.

Sampling in accordance to S-S-05 required prior to June 2017.

Itron
  • CP2SO
  • CP2SOA
AE-1822
  • 1 element, 2 wire, single phase, 120-480 volts, 0.2-20 amperes, 60 Hz
  • 1.5 elements, 3 wire, single phase, 120-480 volts, 0.5-200 amperes, 60 Hz
  • 2.0 elements, 3 wire, network and delta, 120-480 volts, 0.2-20, 0.5-200 amperes, 60 Hz
  • 3.0 elements, 4 wire Wye and delta, 120-480 volts, 0.2-20, 0.5-200 amperes, 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2011.

Sampling in accordance to S-S-05 required prior to June 2017.

Quadlogic Controls Corp.
  • MC-5
AE-1148
  • 1 element, 2 wire, 2 element, 3 wire, 3 element,  4 wire, Wye 120 to 600 Volts, 0.1-10 amperes, External Sensors 1-100, 2-200 amperes 60 Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2007.

Sampling in accordance to S-S-05 required prior to June 2013.

General Electric Co.
  • I-210+c
  • I-210+ce
  • I-210+cn
AE-1652
  • 1 element, 2 wire, single phase, 120, 240 volts, 0.2-20, 1.0-100 amperes, 60 Hz
  • 1.5 element, 3 wire, single phase, 240 volts, 2.0-200 amperes, 60 Hz
  • 2 element, 3 wire, network, 120 volts, 2.0-200 amperes, 60  Hz

Conditional 10 year initial reverification period applicable to meters verified on or after January 1st, 2011.

Sampling in accordance to S-S-05 required prior to June 2017.

(Electronic electricity meters qualified for a conditional 10 year initial reverification period which are subject to additional testing prior to the end of the six year initial reverification period)

Table 3–Electronic Electricity Meters that no longer Qualify for the Conditional 10 Year Initial Reverification Period
Manufacturer Model(s) Approval No. Rating/Configuration Applicability
Itron
  • Q1000
AE-0828
  • 2 element, 3 wire, delta, 69, 120 volts, 0.05 -20 amperes, 60 Hz
  • 2.5 element, 4 wire, Wye or delta, 69, 120 volts, 0.05 -20 amperes, 60 Hz
  • 3 element, 4 wire, Wye or delta, 69, 120 volts, 0.05 -20 amperes, 60 Hz
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003.
Power Measurement Ltd.
  • ION 8300
  • 8400
  • 8500
  • 8600
AE-0924
  • 2 element, 3 wire, delta, 120 to 480 volts (L-L), 0.1-20, 0.05-20 amperes, 60 Hz
  • 2.5 element, 4 wire, Wye, 69 to 277 volts (L-N), 0.1-20, 0.05-20 amperes, 60 Hz
  • 3 element, 4 wire, Wye, 69 to 277 volts (L-N), 0.1-20, 0.05-20 amperes, 60 Hz
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or after January 1st, 2003.
Power Measurement Ltd.
  • ION 6200
  • Siemens 9200
AE-1143
  • 2 element, 3 wire, single phase, 69 to 347 volts (L-N), 0.1-10 amperes, 60 Hz
  • 2 element, 3 wire, delta, 120 to 600 volts (L-L), 0.1-10 amperes, 60 Hz
  • 3 element, 4 wire, Wye, 69 to 347 volts (L-N), 0.1-10 amperes, 60 Hz
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or afterJanuary 1st, 2003.
Power Measurement Ltd.
  • ION 7550
  • 7650
  • Siemens 9510
  • 9610
AE-1484
  • 3 element, 4 wire, Wye, 57 to 347 volts (L-N), 0.05-20 amperes, 60Hz
  • 2 element, 3 wire, delta, 120 to 600 volts (L-L), 0.05-20 amperes, 60Hz
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or afterJanuary 1st, 2003.
Power Measurement Ltd.
  • ION 8600
AE-1535
  • 2 element, 3 wire, delta, 120 volts (L-L), 0.2-20 amperes, 25Hz
  • 3 element, 4 wire, Wye, 120 volts (L-L), 0.2-20 amperes, 25Hz
Conditional 10 year initial reverification period qualification suspended. Initial reverification period amended to 6 years, applicable to all meters verified on or afterJanuary 1st, 2003.

(Electronic electricity meters that no longer qualify for the conditional 10 year initial reverification period or have not completed the sampling as required in accordance with S-S-05)

4.0 Revision

4.1 The purpose of revision 2 was to clarify and reflect the change in references from Measurement Canada provisional specification PS-E-11 to specification S-EG-01. Revision 2 amends the scope to include meters that have been conditionally and unconditionally qualified to receive a 10 year initial reverification period, and meters that no longer qualify for a lengthened initial reverification period.

4.2 The purpose of revision 3 was to add AE-1320 to table 1 and include additional configurations for AE-1611 in table  2.

4.3 The purpose of revision 4 was to add additional ratings and or configurations for AE-1611 and AE-0764 in table 2.

4.4 The purpose of revision 5 was to add additional ratings and or configurations for the meters under AE-1517 and AE-1579 in table 2. Also, meters under AE-1145 are included in table 3 to indicate a suspension of the lengthened initial reverification period until sampling pursuant to S-S-05 is completed.

4.5 The purpose of revision 6 was to add AE-1356 to table 1.

4.6 The purpose of revision 7 is to add AE-1434 to table 1.

4.7 The purpose of revision 8 is to add additional ratings and configuration for AE 1466 and AE-1168. Revision 8 has also been revised to add the following to table 1 and 2:

  • Table 1: AE-1466 and AE 1145
  • Table 2: AE-1148, AE-1652, AE-1631 and AE-1822

5.0 Additional Information

For additional information regarding this bulletin, please contact the Senior Program Officer responsible for electricity measurement.

David Flieler
Senior Program Officer

Footnotes

Footnote 1

(L, A, Q, +) /(P, M, Z, S, A) Only model designations with '+' in the type designation.

Return to footnote 1 referrer