P-E-01–Procedures for Calibrating and Certifying Electricity Meter Calibration Consoles Pursuant to EL-ENG-12-01 – Requirements for the Certification of Measuring Apparatus – Electricity Meter Calibration Consoles
Category: Electricity
Procedure: P-E-01 (rev. 4)
Document: EL-ENG-12-01
Issue Date:
Effective Date:
Supersedes: P-E-01 (rev. 3)
Table of Contents
- 1.0 Purpose
- 2.0 Scope
- 3.0 References
- 4.0 Safety and Hazard Considerations
- 5.0 Procedures for the Assessment of Administrative Requirements (EL-ENG-12-01, s. 5.0)
- 5.1 Roles and Responsibilities (EL-ENG-12-01, s. 5.2)
- 5.1.1 Purpose
- 5.1.2 Certification Process
- 5.1.3 Test Equipment (EL-ENG-12-01, s. 5.2.1)
- 5.1.4 Pre-testing (EL-ENG-12-01, s. 5.2.5)
- 5.1.5 Required Information (EL-ENG-12-01, s. 5.2.6)
- 5.1.6 Test Burdens (EL-ENG-12-01, s. 5.2.7)
- 5.1.7 Requirements for Maintaining Certification (EL-ENG-12-01, ss. 5.2.8 to 5.2.11)
- 5.1.8 Procedures for the Assessment of Markings and Documentation (EL-ENG-12-01, s. 5.3)
- 5.1.9 Records (EL-ENG-12-01, s. 5.3.2)
- 5.1.10 Operating Manuals and Schematics (EL-ENG-12-01, s. 5.3.3)
- 5.1.11 Calibration Console Markings (EL-ENG-12-01, s. 5.3.4)
- 5.1 Roles and Responsibilities (EL-ENG-12-01, s. 5.2)
- 6.0 Procedures for the Assessment of Technical Requirements (EL-ENG-12-01, s. 6.0)
- 6.1 Use Requirements (EL-ENG-12-01, s. 6.1)
- 6.2 Environmental Requirements: Temperature (EL-ENG-12-01, s. 6.2.1)
- 6.3 Mechanical Requirements (EL-ENG-12-01, s. 6.3)
- 6.3.1 Grounding (EL-ENG-12-01, s. 6.3.3)
- 6.3.1.1 Guidelines
- 6.3.1.2 Apparatus for Consoles without Automatic Ground Fault Protection
- 6.3.1.3 Procedure for Consoles without Automatic Ground Fault Protection
- 6.3.1.4 Apparatus for Consoles with Automatic Ground Fault Protection Consisting of a Ground Fault Interrupting Circuit Breaker That Does Not Have a Test Function
- 6.3.1.5 Procedure for Consoles with Automatic Ground Fault Protection Using the Test Switch
- 6.3.1.6 Procedure for Consoles with Automatic Ground Fault Protection that do Not Have CSA-Approved Test Function
- 6.3.1.7 Additional Grounding Procedure
- 6.3.2 Isolation from Ground (EL-ENG-12-01, s. 6.3.4.1)
- 6.3.3 Isolation of Secondary Circuits from Primary Circuits (EL-ENG-12-01, s. 6.3.4.2)
- 6.3.4 Meter Mounting Arrangements (EL-ENG-12-01, s. 6.3.5)
- 6.3.5 Operating Mode (EL-ENG-12-01, s. 6.3.6)
- 6.3.6 Individual Elements (EL-ENG-12-01, s. 6.3.7)
- 6.3.1 Grounding (EL-ENG-12-01, s. 6.3.3)
- 6.4 Procedures for the Assessment of Electrical Requirements (EL-ENG-12-01, s. 6.4)
- 7.0 Procedures for the Assessment of Metrological Requirements (EL-ENG-12-01, s. 7.0)
- 7.1 General Procedures for the Assessment of Metrological Requirements
- 7.2 General Test Setup
- 7.3 Basic Procedure for Conducting Accuracy Tests
- 7.3.1 Basic Procedure for Conducting Energy Accuracy Tests
- 7.3.1.1 Guidelines
- 7.3.1.2 Apparatus
- 7.3.1.3 Procedure
- 7.3.1.4 Procedure for Aligning the Infrared Probe OP-01
- 7.3.1.5 Procedure for Aligning the Radian Light Valve RM-1P
- 7.3.1.6 Procedure for Aligning the Infrared Probe OP-01 and the Radian Light Valve RM-1P
- 7.3.1.7 Calibration Console Error Calculation (EL-ENG-12-01, s. 7.1.2)
- 7.3.2 Basic Procedure for Conducting Demand Accuracy Tests
- 7.3.2.1 Guidelines
- 7.3.2.2 General Setup
- 7.3.2.3 Procedure for Consoles Using an Internal Demand Reference Meter and an Indicating Instrument
- 7.3.2.4 Procedure for Consoles Using an External Dedicated Demand Reference Meter with Input Connections for Counting Pulses From an External Reference Meter
- 7.3.2.5 Procedure for Consoles Using an External Dedicated Demand Reference Meter without Input Connections for Counting Pulses From an External Reference Meter
- 7.3.2.6 Formula
- 7.3.3 Minimum Duration of Accuracy Tests (EL-ENG-12-01, s. 7.1.3)
- 7.3.4 Console Configurations, Test Loads, Burdens and Burden Effects (EL-ENG-12-01, ss. 7.2 and 7.3)
- 7.3.4.1 Purpose
- 7.3.4.2 Guidelines for Console Configurations
- 7.3.4.3 Test Burden (EL-ENG-12-01, s. 7.2.3)
- 7.3.4.4 Apparatus for Assessment
- 7.3.4.5 Procedure for the Assessment of Test Burdens using 1:1 Isolation Transformers
- 7.3.4.6 Procedure for the Assessment of Polyphase Transformer-type Test Burdens
- 7.3.4.7 Procedure for the Assessment of Self-contained Test Burdens
- 7.3.1 Basic Procedure for Conducting Energy Accuracy Tests
- 7.4 Variation from Position to Position (EL-ENG-12-01, s. 7.4)
- 7.5 Distortion (EL-ENG-12-01, s. 7.5)
- 7.5.1 Purpose
- 7.5.2 Guidelines
- 7.5.3 Procedures for the Assessment of Distortion using Recti-thermal Demand Meters
- 7.5.4 Procedure for the Assessment of Distortion for 1:1 CTs and Multiple PTs
- 7.5.5 Procedure for the Assessment of Distortion for Other Meters (No 1:1 CT or Multiple PT in Circuit)
- 7.5.6 Formulae
- 7.6 Regulation (EL-ENG-12-01, s. 7.6)
- 7.7 Current Switching Effects (EL-ENG-12-01, s. 7.7)
- 7.8 Console Calibration (EL-ENG-12-01, 7.8)
- 7.8.1 Purpose
- 7.8.2 Guidelines
- 7.8.3 Procedure for 1:1 CT and/or Multiple PT Calibration
- 7.8.4 Procedure for the Calibration of Consoles without Isolation Transformers with Other Intervening Transformers Connected Between the Reference Meters and the MUT Positions
- 7.8.5 Procedure for the Calibration of Consoles with the Reference Meters in the Same Circuit as the MUT Positions
- 7.8.6 Procedure for the Calibration of Consoles That Apply Voltage and/or Current to Individual Circuits (Elements) of a Meter from Independent Sources
- 7.8.7 Remarks
- 7.9 Measurement Uncertainty (EL-ENG-12-01, s. 7.9)
- 7.9.1 Purpose
- 7.9.2 Guidelines
- 7.9.3 Combined Console Uncertainty
- 7.9.3.1 Influences
- 7.9.3.2 Reduction Equation for Console Uncertainty
- 7.9.3.3 General Procedure
- 7.9.3.4 Uncertainty due to Burden Effects
- 7.9.3.5 Uncertainty due to Position-to-Position Errors
- 7.9.3.6 Uncertainty Due to Current Switching Effects
- 7.9.3.7 Uncertainty Due to Regulation
- 7.9.3.8 Reference Standard Uncertainty
- 7.9.3.9 Uncertainty due to Repeatability
- 7.9.3.10 Official Uncertainty Figures
- 7.10 Pulse Counters and Generators
- 7.11 Rangeability
- 8.0 Revisions
- 9.0 Additional Information
- Date modified: