Archived — S-G-03—Consultation comparison tables

PDF version

The following tables are intended to facilitate the consultation process by comparing the requirements set forth in S-G-03 (rev.1) to those in current Measurement Canada approval specifications.

Table 1: S-G-03 (rev.1), Part 1 – General
Table 1: S-G-03 (rev.1), Part 1 – General
S-G-03 (rev.1) LMB-EG-08 S-G-03 Comments
Purpose

1.0

1.1

1.2

1.3

1.4

1.5

Section 1 – Scope

Section 3 – 3-1 Scope

5.1

5.1.1 (Section 1 – Scope)

"Purpose" section added in S-G-03 (rev.1) and updated based on OIML R 137-1 section 2 "Scope".

Item 1.3 in S-G-03 (rev.1) was previously mentioned in PS-G-06 (1.0).

Scope

2.0

2.1

2.2

2.3

Section 1 – Scope

Section 3 – 3-1 Scope

5.1

5.1.1 (Section 1 – Scope)

Authority

3.0

Section 1 – Scope

5.1

5.1.1 (Authority)

All refer to section 9 of the Electricity and Gas Inspection Act, but S-G-03 (rev.1) also refers to Part III of the Electricity and Gas Inspection Regulations.

References

4.0

Section 1 – Scope

  • CGA Installation Code for Natural Gas Burning Appliances and Equipment: CGA B149.
  • AGA Reports No. 3, 5 and 8.
  • ANSI Standard ANSI/API 2530.
  • United States Department of Defense Military Standard MIL-STD-461B.

5.1

5.1.1 (Section 1 – Scope)

In addition to LMB-EG-08:

  • Gas Processors Association Standard 2172.
  • Manual for the Determination of Supercompressibility Factors for Natural Gas — Par Research Project NX-19, Extension of Range of Supercompressibility Tables.
  • STD-461E replaces MIL-STD-461B.

S-G-03 (rev.1) identifies the current documents being referenced during approvals for all type of meters, ancillary devices and associated measuring instruments.

Terminology

5.0

Section 2 – Definitions

  • Contractor's badge
  • Mechanical register
  • Primary meter
  • Priority pen
  • Programmable constant

5.2

5.2.1 In addition to the definitions in LMB-EG-08:

  • Calorific power
  • Electronic display
  • Electronic register
  • Integral transducer or transmitter
  • Non-integral transducer or transmitter

S-G-03 (rev.1) gives a longer list of definitions.

List contains definitions based on OIML R 137 1-2, OIML V1, OIML D11 and VIM.

S-G-03 (rev.1) also includes definitions that were in other MC approval specifications and these specifications are now included in S-G-03 (rev.1).

Units

6.0

Section 3 – General

3-2 Units

5.3

5.3.1

6.1

6.1.1

3-2.1

5.3.1 (3-2.1)

6.1.1.1

3-2.1

5.3.1 (3-2.1.1)

6.1.2

N/A

N/A

NewFoonote 1

6.2

N/A

5.3.1 (3-2.2)

6.2.1

N/A

5.3.1 (3-2.2.1)

In 2013, the Canadian Metric Practice Guide - CAN Z234.1-00 was withdrawn from the list of standards by the Canadian Standards Association (CSA), as there was no longer a committee in place to oversee the standard.

6.2.2

N/A

5.3.1 (3-2.2.2)

In 2013, the Canadian Metric Practice Guide - CAN Z234.1-00 was withdrawn from the list of standards by the Canadian Standards Association (CSA), as there was no longer a committee in place to oversee the standard.

6.3

N/A

5.3.1 (3-2.3)

5.3.1 (3-2.3.1)

Metrological requirements

7.0

N/A

N/A

7.1

7.1(a)

7.1(e)

3-3.1

3-6.3.2

N/A

Items b), c), d), f), g), h) and i) in S-G-03 (rev. 1) are new.Foonote 2

Section 7.1 was added to S-G-03 (rev.1) to make it in line with OIML R 137-1.

Previously, there was no rated operating condition section.

The AC mains voltage was 85% and 110% of the nominal voltage.

7.2

7.2.1

7.2.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.2)

Introduction of the transitional flow rate (Qt).

7.3

7.3.1

7.3.1.1

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.3.1)

7.3.1.2

See comment

See comment

The MPEs applicable to various types of gas meters, ancillary devices and associated measuring instruments were available in each device type section.

7.3.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.3.3)

7.3.2.1

N/A

N/A

NewFoonote 1

7.4

See comments

See comments

Revised/updatedFoonote 2 in S-G-03 (rev.1). (OIML R 137-1, clause 5.4)

Already in:

  • PS-G-06 (ultrasonic meters)
  • PS-G-15 (fluidic oscillation meters)

The weighing factor was as per OIML R 137, edition 2006.

There was no tolerance for the value of the flow rate weighted mean error (FWME). However, there was a tolerance for the linearity which is calculated based on the maximum difference between the FWME and any of the deviations.

7.5

See comments

See comments

Revised/updatedFoonote 2 in S-G-03 (rev.1). (OIML R 137-1, clause 5.7)

Already in:

  • PS-G-06 (ultrasonic meters)
  • PS-G-15 (fluidic oscillation meters)
  • PS-G-16 (orifice plates)

7.6

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.8)

7.7

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.9, except the MPE never changes)

7.8

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.10)

7.9

7.9.1

7.9.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.12)

7.10

7.10.1

7.10.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.13.1)

7.11

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.13.2)

7.12

7.12.1

7.12.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.13.3)

7.13

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.13.4)

7.14

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.13.5)

7.15

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 5.13.8)

7.16

3-6.1

N/A

7.17

7.17.1

7.17.2

7.17.3

N/A

N/A

NewFoonote 2 (Similar to OIML R 137-2, clause 11.1.2.)

Technical requirements

8.0

N/A

N/A

8.1

8.1.1

8.1.2

8.1.3

3-3.1

N/A

8.1.4

3-3.4

N/A

8.1.4.1

N/A

N/A

NewFoonote 1

8.2

8.2.1

3-3.2

5-3.2 (3-3.2)

8.2.2

3-3.2

N/A

8.3

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 6.1.9)

8.4

8.4.1

8.4.1.1

8.4.1.2

8.4.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 6.2)

8.5

8.5.1

8.5.2

N/A

N/A

NewFoonote 1

8.6

8.6.1

3-3.5

N/A

8.6.2

N/A

N/A

NewFoonote 1

8.7

3-4

5-3.3

RevisedFoonote 2, now three types of power sources.

(OIML R 137-1, clause 6.6)

8.7.1 (a)

3-4.1

N/A

8.7.1 (b)

N/A

N/A

NewFoonote 2, now three types of power sources.

(OIML R 137-1, clause 6.6)

8.7.1 (c)

3-4.1

5-3.3 (3-4.1.2)

8.7.2

N/A

N/A

NewFoonote 2, now three types of power sources.

(OIML R 137-1, clause 6.6)

8.8

See comment

See comment

Software specifications S-EG-05 and S-EG-06 are now available.

Marking requirements

9.0

3-5

N/A

9.1

9.1.1

3-5.1

N/A

9.1.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 7.1)

9.1.3

3-5.1

N/A

RevisedFoonote 2 (OIML R 137-1, clause 7.1.1)

9.1.3 (a)

3-5.1(5)

N/A

9.1.3 (b)

3-5.1(1)

N/A

9.1.3 (c)

3-5.1(2)

N/A

9.1.3 (d)

3-5.1(3)

N/A

9.1.3 (e)

3-5.1(4)

N/A

9.1.3 (f)

6-3.1(2) 7-3.1(2)

N/A

In LMB-EG-08, the requirements applied to rotary and turbine meters.

9.1.3 (g)

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 7.1.1(h))

9.1.3 (h)

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 7.1.1(g))

9.1.3 (i) 9.1.3 (j) 9.1.3 (k) 9.1.3 (l) 9.1.3 (m)

See comment

See comment

Same requirements in multiple sections, where applicable.

9.1.4

N/A

N/A

NewFoonote 1

9.2

9.2.1

9.2.2

5-3.1

6-3.1.1

7-3.3

5.5.1 (5-3.1.1)

5.7.1 (7-3.3)

9.3

9.3.1

6-3.1.2

N/A

9.4

3-5.3

N/A

9.5

9.5.1

9.5.2

N/A

N/A

NewFoonote 2 (Similar to OIML R 137-1, clauses 6.2 and 7.1.1(m))

9.6

3-5.4

N/A

9.7

9.7.1

3-5

3-5.1

N/A

9.7.2

3-4.1

5.3.3 (3-4.1.1)

RevisedFoonote 2 (OIML R 137-1, clause 7.1.4)

In LMB-EG-08 and S-G-03, replacement of batteries or other power sources was required at least every 90 days.

9.7.3

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 6.6.3)

9.7.4

N/A

5.3.4 (3-5.5)

9.8

9.8.1

9.8.2

3-5.2

N/A

9.9

9.9.1

9.9.2

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 6.5.1)

9.9.3

3-5.4

N/A

Sealing requirements

10.0

10.1

10.2

3-3.3

N/A

S-EG-02 – Specifications for approval of physical sealing provisions for electricity and gas meters

10.3

6-2.2

7-2.2

N/A

In LMB-EG-08, the requirements were applicable to rotary and turbine meters.

10.4

N/A

N/A

NewFoonote 2 (OIML R 137-1, clause 6.5.2)

10.5

4-2.1

N/A

Administrative requirements

11.0

11.1

11.1.1

11.1.1.1

N/A

N/A

NewFoonote 2 (based on OIML R 137, clause 12.2)

11.1.2

N/A

N/A

Refers to S-EG-05 and S-EG-06.

11.1.3

11.1.3.1

NewFoonote 1

11.2

11.2.1

11.2.2

11.2.2

1 11.2.3

11.2.4

11.2.5

11.2.6

11.2.6.1

N/A

N/A

NewFoonote 2 (based on OIML R 137, clause 12.2)

11.3

See comments

See comments

NewFoonote 1, Foonote 2

Requirements were in MC's Engineering and Laboratory Services Directorate's (ELSD) procedure GL-LP-07 and it described the method used for selecting gas measuring devices.

Also based on OIML requirements in R 137-2, clause 12.4.

11.4

11.5

11.5.1

11.5.2

N/A

N/A

NewFoonote 1

Performance tests

12.0

3-6

12.1

12.1.1

12.1.2

12.1.3

N/A

N/A

NewFoonote 1

12.1.4

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.5.2.1)

12.2

12.2.1

3-6.1

N/A

12.2.1(a)

3-6.1(1)

5.3.5 (3-6.1(a))

RevisedFoonote 2 (OIML R 137-1, clause 12.5.2.1)

Now (20.0 ± 5.0) °C

  • Was (23.0 ± 2.0) °C in LMB-EG-08.
  • Was (20.0 ± 2.0) °C in S-G-03.

12.2.1(b)

3-6.1(4)

N/A

12.2.1(c)

3-6.1(5)

N/A

12.2.1(d)

3-6.1(7)

N/A

12.2.1(e)

3-6.1(8)

N/A

12.2.2

3-6.3

N/A

12.2.2(a)

3-6.3.1

12.2.2(b) 12.2.2(c)

N/A

N/A

NewFoonote 1

12.2.3

N/A

N/A

12.2.3.1(a)

3-6.1(2)

N/A

12.2.3.1(b)

5-4.3

6-4.5.1

7-4.6.1

9-4.5

10-5.4

N/A

12.2.3.2

3-6.1(3)

N/A

12.3

12.3.1

12.3.2

12.3.3

12.3.4

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.5.2.2)

12.4

12.4.1

12.4.2

N/A

N/A

NewFoonote 1

12.5

12.5.1

N/A

N/A

NewFoonote 1

12.5.2

12.5.2.1

12.5.2.2

3-6.2

N/A

12.5.3

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.1)

12.5.4

12.5.4.1

12.5.4.2

See comments

See comments

NewFoonote 2 (OIML R 137-2, clause 12.6.3)

Repeatability is not mentioned in LMB-EG-08 and S-G-03 but it is in PS-G-15 and PS-G-16.Foonote 1

12.5.5

12.5.5.1

12.5.5.2

12.5.5.3

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.4)

12.5.6

12.5.6.1

12.5.6.2

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.5)

12.5.7

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.6)

12.5.8

3-6.1(6)

N/A

12.5.8.1

7-4.1.4

N/A

12.5.8.2

12.5.8.3

N/A

N/A

NewFoonote 1

12.5.8.4(a)

7.4.5.2

N/A

Flow disturbance requirements mentioned in PS-EG-16.

12.5.8.4(b) 12.5.8.4(c)

N/A

N/A

NewFoonote 1, flow disturbance requirements mentioned in PS-EG-16.

12.5.8.4(d)

N/A

N/A

NewFoonote 2 (OIML R 137-2, B.1.1)

12.5.8.4(e)

N/A

N/A

NewFoonote 2 (OIML R 137-2, B.2.3)

12.5.8.4(f)

N/A

N/A

NewFoonote 2 (OIML R 137-2, B.2.4)

12.5.9

12.5.9.1

12.5.9.2

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.9)

12.5.9.3

12.5.9.4

12.5.9.5

12.5.9.6

12.5.9.7

12.5.9.8

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.9)

12.5.10

12.5.10.1

12.5.10.2

N/A

N/A

NewFoonote 1

Alternative fluids are not mentioned in LMB-EG-08 and S-G-03.

GS-ENG-04-03: ELSD engineering specification on the alternative fluids for testing.

12.5.11

12.5.11.1

12.5.11.2

N/A

N/A

NewFoonote 2 (OIML R 137-2, clause 12.6.13)

12.5.12

12.5.12.1

12.5.12.2

3-6.3.2

N/A

RevisedFoonote 2 (OIML R-137-2, A.7.2)

In LMB-EG-08, the supply voltage is equal to 90% and 110%.

12.5.13

3-6.3.3

N/A

RevisedFoonote 2 (OIML R-137-2, A.6.1.1)

12.5.14

3-6.3.4

N/A

RevisedFoonote 2 (OIML R-137-2, A.6.1.2)

top of page

Table 2: S-G-03 (rev.1), Part 2 – Diaphragm meters
Table 2: S-G-03 (rev.1), Part 2 – Diaphragm meters
S-G-03 (rev.1) LMB-EG-08 (Section 5) S-G-03 (5.5 Amendments to section 5) Comments
Scope

1.0

5.1

N/A

Terminology

2.0

N/A

N/A

Apparent rated capacity (LMB-EG-08, clause 5-4.2.1)

Low load registration test (LMB-EG-08, clause 5-4.2.4)

Units

3.0

N/A

N/A

Metrological requirements

4.0

N/A

N/A

4.1

N/A

N/A

New

Qmin, Qt and Qmax are not used in diaphragm meter applications.

4.2

5-4.2.2

N/A

4.3

4.3.1

5-4.2.4

N/A

4.3.2

5-4.2.5

5-4.3

N/A

Revised

In LMB-EG-08, it was stated that at other than reference environmental conditions, errors of registration for non-temperature correcting meters must not exceed ± 1.0% of the true value and for temperature correcting meters, they must not exceed ± 1.5% of the true value.

In S-G-03 (rev1.), the error shall not exceed ± 2.0%.

4.3.3

5-4.2.3

N/A

Technical requirements

5.0

5.1

3-3.4

14.1

N/A

5.2

5-2.1

N/A

5.3

5-2.2

N/A

Marking requirements

6.0

5.3

5.5.1 (5.3)

6.1

5-3.1(2)

5.5.1 (5-3.1(b))

Requirements 5-3.1(a) and 5-3.1.1 in S-G-03 were moved to 9.1.3(j) and 9.2.1 in S-G-03 (rev.1), Part 1 – General.

6.2

5-3.2

5.5.1 (5-3.2)

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

9.1(a)

5-4.2.1

N/A

9.1(b)

5-4.2.4

N/A

9.1(c)

5-4.2.5

N/A

9.2

5-4.3

N/A

N/A

5-4.1.1

N/A

Connection Pipes to the MeterFoonote 3

N/A

5-4.1.2

N/A

Location of Pressure TapsFoonote 3

N/A

5-4.1.3

N/A

Pressure Tap HolesFoonote 3

N/A

5-4.1.4

N/A

Pressure MeasurementFoonote 3

top of page

Table 3: S-G-03 (rev.1), Part 3 – Rotary meters
Table 3: S-G-03 (rev.1), Part 3 – Rotary meters
S-G-03 (rev.1) LMB-EG-08 (Section 6) S-G-03 (5.6 Amendments to section 6) Comments
Scope

1.0

1.1

6.1

N/A

1.2

N/A

N/A

NewFoonote 1

Terminology

2.0

N/A

N/A

Units

3.0

N/A

5.3.1 (3-2)

3.1

N/A

5.3.1 (3-2.1.2)

Metrological requirements

4.0

N/A

N/A

4.1

6-4.4.1

N/A

4.2

6-4.2.2

6-4.4.3

N/A

Revised

In LMB-EG-08, it was stated that at other than reference environmental conditions, the error of the uncorrected registration must not exceed ± 1.0%.

In S-G-03 (rev 1.), the error shall not exceed ± 2.0%.

Technical requirements

5.0

N/A

N/A

5.1

6-2.1

N/A

Marking requirements

6.0

N/A

N/A

Requirements 6-3.1, 6-3.1.1 and 6-3.1.2 were moved to 9.1.3 (f-j), 9.2 and 9.3 in S-G-03 (rev.1), Part 1 – General.

6.1

N/A

N/A

NewFoonote 1

6.2

6-3.2

5.6.1 (6-3.2) 5.6.1 (6-3.2.1)

6.2(a)

6-3.2

5.6.1 (6-3.2.2)

6.2(b)

6-3.2

5.6.1 (6-3.2.3)

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

N/A

N/A

9.1

N/A

N/A

9.1.1

6-4.2

N/A

9.2

N/A

N/A

9.2.1

6-4.4.1

N/A

Revised; the instructions on how to get the differential pressure will be included in the ELSD's approval procedure.

9.2.2

6-4.4

6-4.5

N/A

9.2.2.1

6-4.4.2

N/A

9.2.2.2

6-4.5.1

N/A

N/A

6-4.1

N/A

Pressure MeasurementFoonote 3

N/A

6-4.3

N/A

Temperature MeasurementFoonote 3

top of page

Table 4: S-G-03 (rev.1), Part 4 – Turbine meters
Table 4: S-G-03 (rev.1), Part 4 – Turbine meters
S-G-03 (rev.1) LMB-EG-08 (Section 7) S-G-03 (5.7 Amendments to section 7) Comments
Scope

1.0

7.1

N/A

Terminology

2.0

N/A

N/A

Units

3.0

N/A

N/A

Metrological requirements

4.0

N/A

N/A

4.1

7-4.5.1

7-4.6.1

N/A

RevisedFoonote 4 (based on AGA Report No. 7)

4.2

4.3

N/A

N/A

NewFoonote 4 (based on AGA Report No. 7)

4.4

7-4.5.2

N/A

4.5

7-4.5.3

N/A

Technical requirements

5.0

N/A

N/A

5.1

7-2.1

N/A

Marking requirements

6.0

N/A

N/A

Requirements 6-3.1, 6-3.1.1 and 6-3.1.2 were moved to 9.1.3 (f-j), 9.2 and 9.3 in S-G-03 (rev.1), Part 1 – General.

6.1

N/A

N/A

NewFoonote 4 (based on AGA Report No. 7)

6.2

7-3.2

N/A

6.3

7-3.5

N/A

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

N/A

N/A

9.1

9.1.1

9.1.1.1

9.1.1.2

9.1.1.3

N/A

N/A

NewFoonote 1

From GS-ENG-04-02: Review of Measurement Canada Turbine Meter Verification Testing Requirements in Light of AGA Report No. 7 (2006)

9.2

7-4.1.3

N/A

9.3

9.3.1

9.3.2

N/A

N/A

NewFoonote 1

From GS-ENG-04-02: Review of Measurement Canada Turbine Meter Verification Testing Requirements in Light of AGA Report No. 7 (2006)

9.4

7-4.2

N/A

Revised; the instructions on how to get the differential pressure will be included in the ELSD's approval procedure.

9.5

7-4.3

N/A

9.6

9.6.1

N/A

N/A

9.6.1.1

7-4.5.1

N/A

9.6.1.2

7-4.6.1

N/A

9.6.2

9.6.2.1

9.6.2.2

9.6.2.3

7-4.5.2

N/A

RevisedFoonote 2

Based on OIML R-137 disturbance requirements (25%, 40% and 100% of Qmax). In LMB-EG-08, the test points were 25%, 50%, 75% and 100% of Qmax.

9.6.3

7-4.5.3

N/A

N/A

7-4.1.1

N/A

Interior of Connection PipesFoonote 3

N/A

7-4.1.2

N/A

Pipe-Meter AlignmentFoonote 3

See comment

7-3.3

5.7.1 (7-3.3)

This requirement was moved to Part 1, 9.2 in S-G-03 rev.1

top of page

Table 5: S-G-03 (rev.1), Part 5 – Orifice meters
Table 5: S-G-03 (rev.1), Part 5 – Orifice meters
S-G-03 (rev.1) LMB-EG-08 (Section 8) S-G-03 (5.8 Amendments to section 8) Comments
Scope

1.0

8.1

N/A

Terminology

2.0

N/A

N/A

Units

3.0

N/A

N/A

Metrological requirements

4.0

N/A

N/A

4.1

8-4.2

5.8.2 (8-4.2)

4.2

8-4.3.1

5.8.2 (8-4.3.1)

Technical requirements

5.0

N/A

N/A

5.1

8-2.1

5.8.1 (8-2.1)

5.1.1

8-2.2

5.8.1 (8-2.2)

5.1.2

8-2.3

5.8.1 (8-2.3)

5.1.3

8-2.4

5.8.1 (8-2.4)

5.1.4

5.1.4.1

5.1.4.2

8-2.5

5.8.1 (8-2.5)

Marking requirements

6.0

8-3

N/A

Requirements 6-3.1, 6-3.1.1 and 6-3.1.2 were moved to 9.1.3 (f-j), 9.2 and 9.3 in S-G-03 (rev.1), Part 1 – General.

6.1

6.2

8-3.1

N/A

6.3

8-3.2 (note)

N/A

6.3.1

8-3.2.1

N/A

6.3.2

8-3.2.2

N/A

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

8.1

N/A

5.8.1 (8-2.5.1) 5.8.2 (8-4.3)

Performance tests

9.0

8-4

5.8.2 (8-4)

9.1

8-4.1

5.8.2 (8-4.1)

9.2

9.2.1

8-4.2

5.8.2 (8-4.2)

N/A

8-4.3.2

5.8.2 (8-4.3.2)

Test Method using Blank PlateFoonote 3

N/A

8-4.3.3

5.8.2 (8-4.3.3)

Sample Calculations

top of page

Table 6: S-G-03 (rev.1), Part 6 – Mass flow meters
Table 6: S-G-03 (rev.1), Part 6 – Mass flow meters
S-G-03 (rev.1) LMB-EG-08 (Section 9) S-G-03 (5.9 Amendments to section 9) Comments
Scope

1.0

9.1

N/A

Terminology

2.0

N/A

N/A

Units

3.0

N/A

N/A

3.1 9-2.1

N/A

Metrological requirements

4.0

N/A

N/A

4.1

9-4.4

9-4.5

N/A

RevisedFoonote 4 (based on AGA Report No. 7)

4.2

4.3

N/A

N/A

NewFoonote 4 (based on AGA Report No. 7)

Technical requirements

5.0

N/A

N/A

Marking requirements

6.0

9-3.1(3)

N/A

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

N/A

N/A

9.1

9-4.3

N/A

9.1.1

9-4.3

N/A

9.1.2 9-4.3 N/A
9.1.3 9-4.3 N/A
9.2 9-4.1 N/A
9.3

9-4.4

9-4.5

N/A

N/A

9-4.3

N/A

Variation of Mass Flow Rate Foonote 3

top of page

Table 7: S-G-03 (rev.1), Part 8 – Fluidic oscillation gas meters
Table 7: S-G-03 (rev.1), Part 8 – Fluidic oscillation gas meters
S-G-03 (rev.1) PS-G-15 (rev.1) Comments
Scope

1.0

1.0

Terminology

2.0

3.0

Units

3.0

N/A

Metrological requirements

4.0

N/A

4.1

4.2

4.3

4.1.1.2

Technical requirements

5.0

5.0

5.1

5.1.1

5.2

5.1.2

Marking requirements

6.0

6.1

Sealing requirements

7.0

N/A

S-EG-02

Administrative requirements

8.0

N/A

NewFoonote 1

8.1

4.1.2.3

Performance tests

9.0

N/A

9.1

9.1.1

4.1.1.1

9.2

N/A

9.2.1

4.1.1.1

9.2.2

4.1.2.1

top of page

Table 8: S-G-03 (rev.1), Part 9 – Cone-shaped differential pressure meters
Table 8: S-G-03 (rev.1), Part 9 – Cone-shaped differential pressure meters
S-G-03 (rev.1) S-G-06 Comments
Scope

1.0

1.0

Terminology

2.0

3.0

Units

3.0

N/A

Metrological requirements

4.0

N/A

4.1

4.2

4.3

4.1.2

4.4

4.4.1

4.4.2

4.1.4

Technical requirements

5.0

5.0

5.1

5.1.5

Marking requirements

6.0

6.1

Sealing requirements

7.0

N/A

S-EG-02

Administrative requirements

8.0

N/A

NewFoonote 1

8.1

5.2.5

Performance tests

9.0

4.1

9.1

9.1.1

9.1.2

4.1.1

9.2

4.1.1.1

top of page

Table 9: S-G-03 (rev.1), Part 10 – Mechanical volume conversion devices (Previously called mechanical correcting devices)
Table 9: S-G-03 (rev.1), Part 10 – Mechanical volume conversion devices
S-G-03 (rev.1) LMB-EG-08 (Section 14) S-G-03 (5.14 Amendments to section 14) Comments
Scope

1.0

14.1

N/A

Terminology

2.0

N/A

N/A

Units

3.0

N/A

N/A

Metrological requirements

4.0

N/A

N/A

4.1

14-4.1.1

14-4.1.2

14-4.1.3

14-4.2.1

14-4.2.2

14-4.2.3

N/A

Technical requirements

5.0

N/A

N/A

5.1

14-2.1

N/A

5.2

14-2.2

N/A

Marking requirements

6.0

14-3

N/A

6.1

6.1.1(a) to 6.1.1(h)(i)

14-3.1

N/A

6.1.1(h)(ii) 6.1.1(h)(iii)

N/A

N/A

NewFoonote 1

6.2

14-3.2

N/A

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

14-4

N/A

9.1

9.1.1

9.1.2

14-4.1

N/A

9.2

9.2.1

N/A

N/A

9.2.1.1

14-4.1.1

N/A

9.2.1.2

14-4.2.1

N/A

9.2.2

14-4.1.2

N/A

9.2.3

N/A

N/A

9.2.3.1(a)

14-4.1.3 (Test no.1)

N/A

9.2.3.1(b)

14-4.1.3 (Test no.2)

N/A

9.2.3.1(c)

14-4.1.3 (Tests no.3 and 4)

N/A

9.2.3.2

14-4.2.3

N/A

9.3

9.3.1

9.3.2

14-4.1

N/A

RevisedFoonote 1

In LMB-EG-08:

  • Integral correcting devices shall be tested at 10% and 100% of Qmax.
  • Auxiliary devices shall be tested at 10% and 100% of the maximum speed of rotation specified by the manufacturer.

9.4

14-4

N/A

9.4.1

14-4.1

14-4.2

N/A

9.4.1.1(a)

14-4.1.1

N/A

9.4.1.1(b)

14-4.2.1

N/A

9.4.1.2

14-4.1.2

N/A

9.4.1.3

14-4.1.3

14-4.2.3

N/A

9.4.2

14-4.1.4

N/A

top of page

Table 10: S-G-03 (rev.1), Part 11 – Electronic volume conversion devices/functions and flow computers (Previously called electronic correcting devices)
Table 10: S-G-03 (rev.1), Part 11 – Electronic volume conversion devices/functions and flow computers
S-G-03 (rev.1) LMB-EG-08 (Section 15) S-G-03 (5.15 Amendments to section 15) Comments
Scope

1.0

15-1

N/A

Terminology

2.0

N/A

N/A

Units

3.0

N/A

N/A

Metrological requirements

4.0

N/A

N/A

4.1

15-5.1.1

15-5.1.2

15-5.2.1

15.5.2.2

N/A

Technical requirements

5.0

N/A

N/A

5.1

15-3.2

N/A

5.2

5.2.1

5.2.2

15-3.1

5.15.1 (15-3.1)

5.3

N/A

N/A

5.3.1

N/A

N/A

NewFoonote 2 (OIML R 140, clause 8.7.1)

5.3.2

5.3.2.1

5.3.2.2

15-3.6

N/A

Marking requirements

6.0

15-4

5.15.2 (15-4)

6.1

15-4.1

5.15.2 (15-4.1)

RevisedFoonote 1

6.2

15-3.3

N/A

6.3

N/A

N/A

NewFoonote 1

6.4

15-4.2

5.15.2 (15-4.2)

Sealing requirements

7.0

N/A

N/A

S-EG-02

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

15-5

5.15.3 (15-5)

9.1

9.1.1

15-5.1.2

5.15.3 (15-5.1.2.1(a))

9.2

9.2.1

N/A

N/A

9.2.1.1

15-5.1.1

5.15.3 (15-5.1.1)

9.2.1.2

15-5.2.1

5.15.3 (15-5.2.1)

9.2.2

N/A

N/A

9.2.2.1(a)

15-5.1.2

5.15.3 (15-5.1.2.2)

9.2.2.1(b)

15-5.2.2

5.15.3 (15-5.2.2.1)

9.2.2.2

15-5.1.2

15-5.2.2

5.15.3 (15-5.1.2.3) 5.15.3 (15-5.2.2.2)

9.2.2.3(a)

15-5.1.2

5.15.3 (15-5.1.2.4(a))

9.2.2.3(b)

15-5.2.2

5.15.3 (15-5.2.2.3)

9.2.2.3(c)

N/A

5.15.3 (15-5.1.2.4(b))

9.3

9.3.1

9.3.2

15-5.1.2

5.15.3 (15-5.1.2.1(b))

9.4

9.4.1(a)

15-5.1.1

5.15.3 (15-5.1.1)

9.4.1(b)

15-5.1.1

15-5.2.1

5.15.3 (15-5.1.1)

5.15.3 (15-5.2.1)

9.4.2

9.4.2.1(a)

15-5.1.2

5.15.3 (15-5.1.2)

9.4.2.1(b)

15-5.1.2

15-5.2.2

5.15.3 (15-5.1.2.2)

5.15.3 (15-5.2.2.1)

9.4.2.2

15-5.1.2

15-5.2.2

5.15.3 (15-5.1.2.3)

5.15.3 (15-5.2.2.2)

9.4.2.3

15-5.1.2

15-5.2.2

5.15.3 (15-5.1.2.3)

5.15.3 (15-5.2.2.2)

top of page

Table 11: S-G-03 (rev.1), Part 12 – Electrical pulse devices/functions
Table 11: S-G-03 (rev.1), Part 12 – Electrical pulse devices/functions
S-G-03 (rev.1) LMB-EG-08 (Section 21) S-G-03 (5.21 Amendments to section 21) Comments
Scope

1.0

21.1

5.21.1 (21-1.1)

Units

2.0

N/A

N/A

Metrological requirements

3.0

N/A

N/A

3.1

21-3.1

21-3.2

N/A

Technical requirements

4.0

N/A

N/A

Marking requirements

5.0

21-2

N/A

5.1

21-2.1

21-2.2

N/A

5.1.1

5.1.1.1

21-2.1

N/A

5.1.2

5.1.2.1

21-2.2

N/A

5.2

21-2.3

N/A

5.3

5.3.1

21-2.4

N/A

5.3.2

N/A

N/A

NewFoonote 1

5.4

N/A

5.21.2 (21-2.5)

Sealing requirements

6.0

N/A

N/A

S-EG-02

Administrative requirements

7.0

N/A

N/A

NewFoonote 1

Performance tests

8.0

N/A

N/A

8.1

8.1.1(a) 8.1.1(b) 8.1.2

8.1.3

21-3.1

21-3.2

N/A

top of page

Table 12: S-G-03 (rev.1), Part 13 – Indicating devices
Table 12: S-G-03 (rev.1), Part 13 – Indicating devices
S-G-03 (rev.1) LMB-EG-08 (Section 4) S-G-03 (5.4 Amendments to section 4) Comments
Scope

1.0

4-1

N/A

Units

2.0

N/A

N/A

Metrological requirements

3.0

N/A

N/A

3.1

3.1.1

3.1.2

3.1.3

4-4.1

N/A

3.1.4

N/A

N/A

NewFoonote 1

3.2

3.2.1

Technical requirements

4.0

N/A

N/A

4.1

4-2.2

N/A

4.2

4.2.1

4.2.1.1

4.2.1.2

4-2.3

N/A

4.3

N/A

N/A

4.3.1(a)

4-2.5

5.4.1 (4-2.5.1)

4.3.1(b)

4-2.5

5.4.1 (4-2.5.2)

4.3.1(c)

4-2.5

5.4.1 (4-2.5.6)

4.3.1(d)

4-2.5

5.4.1 (4-2.5.4)

4.3.1(e)

4-2.5

5.4.1 (4-2.5.2)

4.3.1(f)

4-2.5

5.4.1 (4-2.5.3)

4.3.1(g)

4-2.5

5.4.1 (4-2.5.5)

4.3.2

4-2.6

N/A

4.3.3

4.3.3(a)

4-2.6.1

5.4.2 (4-2.6.1.1)

4.3.3(b)

4-2.6.1

5.4.2 (4-2.6.1)

4.3.3(c)

4-2.5.7

5.4.2 (4-2.5.7)

4.3.4

6-2.1

7-2.1

N/A

In LMB-EG-08, this requirement was in the rotary and turbine meter sections.

4.4

4.4.1

4.4.2

4.4.3

4-2.7

N/A

Marking requirements

5.0

5.1

4-3

N/A

5.2

4-3.1

N/A

5.3

4-3.2

N/A

Sealing requirements

6.0

N/A

N/A

S-EG-02

Administrative requirements

7.0

N/A

N/A

NewFoonote 1

Performance tests

8.0

N/A

N/A

top of page

Table 13: S-G-03 (rev.1), Part 14 – Gas chromatographs
Table 13: S-G-03 (rev.1), Part 14 – Gas chromatographs
S-G-03 (rev.1) LMB-EG-08 (Section 20) S-G-03 (5.20 Amendments to section 20) Comments
Scope

1.0

20-1

5.20.1 (20-1)

Terminology

2.0

N/A

N/A

Laboratory and online gas chromatographs are defined in S-G-03 (rev.1).

Units

3.0

N/A

N/A

Metrological requirements

4.0

N/A

N/A

4.1

4.1.1

20-4.1

5.20.3 (20-4.1.5)

4.1.2

N/A

5.20.3 (20-4.1.6)

RevisedFoonote 1

In S-G-03 (rev.1): Only for nitrogen and carbon dioxide.

4.2

N/A

N/A

NewFoonote 1

Technical requirements

5.0

5.1

20-4.1

5.20.3 (20-4.1.4)

Marking requirements

6.0

6.1(a)(i)

20-3.1

5.20.2 (20-3.1)

6.1(a)(ii)

N/A

N/A

NewFoonote 1

6.1(b) 6.1(c)

20-3.1

5.20.2 (20-3.1)

Sealing requirements

7.0

N/A

N/A

S-EG-02

7.1

NewFoonote 1

Administrative requirements

8.0

N/A

N/A

NewFoonote 1

Performance tests

9.0

20-4

N/A

9.1

20-4.1

5.20.3 (20-4.1.1)

9.2

20-4.1

20-4.2

5.20.3 (20-4.1.2)

9.3

20-4.1

N/A

9.4

20-4.1

5.20.3 (20-4.1.3)

top of page

Table 14: S-G-03 (rev.1), Part 15 - Dispensers for natural gas
Table 14: S-G-03 (rev.1), Part 15 - Dispensers for natural gas
S-G-03 (rev.1) LMB-EG-08 (Section 10) S-G-03 (5.10 Amendments to section 10) Comments
Scope

1.0

10-1

N/A

Units

2.0

2.1

10-2.2

N/A

Metrological requirements

3.0

N/A

N/A

3.1

10-5.3

10-5.4

10-5.5

N/A

3.2

10-5.6

N/A

3.3

10-5.9

N/A

3.4

10-5.7

N/A

3.5

10-5.8

N/A

Technical requirements

4.0

4.1

4.1.1

4.1.2

10-2.4

N/A

4.2

4.2.1

4.2.2

10-2.4.1

N/A

4.3

10-2.5

N/A

4.3.1

10-2.5.1

N/A

4.3.2

10-2.5.2

N/A

4.4

10-2.6

N/A

4.4.1

10-2.6.1

N/A

4.4.2

10-2.6.2

N/A

4.5

10-2.7

N/A

4.6

10-2.8

N/A

4.7

10-3.1

N/A

Marking requirements

5.0

5.1

N/A

N/A

NewFoonote 1

5.2

10-4

N/A

5.2.1

5.2.2

N/A

N/A

NewFoonote 1

Sealing requirements

6.0

N/A

N/A

6.1

4-2.1

N/A

6.2

6.3

6.4

10-2.1

N/A

6.5

10-2.3.2

N/A

6.6

10-2.6.1

N/A

6.7

10-2.3

N/A

6.7.1

6.7.1.1

6.7.1.2

6.7.1.3

6.7.2

10-2.3.1

N/A

Administrative requirements

7.0

N/A

N/A

NewFoonote 1

Performance tests

8.0

8.1

N/A

N/A

8.1.1

10-5.2

N/A

8.1.2

8.1.3

10-5.3

N/A

8.2

10-5.1

N/A

8.3

8.3.1

N/A

N/A

8.3.1.1

10-5.3

N/A

8.3.1.2

10-5.5

N/A

8.4

8.4.1

N/A

N/A

8.4.1.1

10-5.3

N/A

8.4.1.2

10-5.5

N/A

8.4.1.3

10-5.4

N/A

top of page

Table 15: S-G-03 (rev.1), Part 16 – Pressure regulators
Table 15: S-G-03 (rev.1), Part 16 – Pressure regulators
S-G-03 (rev.1) LMB-EG-08 (Section 22) S-G-03 (5.22 Amendments to section 22) Comments
Scope

1.0

22-1

N/A

Units

2.0

N/A

N/A

Metrological requirements

3.0

N/A

N/A

3.1

3.1.1

3.1.1.1

3.1.2

22-4.3

N/A

Technical requirements

4.0

N/A

N/A

Marking requirements

5.0

5.1

22-3.2

N/A

5.1.1

N/A

N/A

NewFoonote 1

Sealing requirements

6.0

N/A

N/A

S-EG-02

Administrative requirements

7.0

N/A

N/A

NewFoonote 1

Performance tests

8.0

22-4

N/A

8.1

8.2

8.3

8.3.1

22-4.1

22-4.2

N/A

top of page

Table 16: S-G-03 (rev.1), Part 17 – Temperature and pressure transmitters
Table 16: S-G-03 (rev.1), Part 17 – Temperature and pressure transmitters
S-G-03 (rev.1) LMB-EG-08 (Section 16) S-G-03 (5.16 Amendments to section 16) Comments
Scope

1.0

16-1

5.16.1 (16-1)

Units

2.0

N/A

N/A

Metrological requirements

3.0

N/A

N/A

3.1

16-4.2.1

16-4.2.2

16-4.2.2

16-4.3.1

16-4.3.2

16-4.3.3

N/A

Technical requirements

4.0

N/A

N/A

Marking requirements

5.0

16-3

N/A

5.1

16-3.2

N/A

5.2

16-3.3

N/A

5.3

16-3.4

N/A

Sealing requirements

6.0

N/A

N/A

S-EG-02

Administrative requirements

7.0

N/A

N/A

NewFoonote 1

Performance tests

8.0

8.1

8.1.1

8.1.1.1

16-4

N/A

8.1.1.1(a)

16-4.2.1

N/A

8.1.1.1(b)

16-4.3.1

N/A

8.1.1.2

16-4.2.2

N/A

8.1.1.3

16-4.2.3

N/A

8.1.1.3(a)

16-4.2.3.1

N/A

8.1.1.3(b)

16-4.2.3.2

N/A

8.2

8.2.1

N/A

N/A

8.2.1.1

16-4.2.1

16-4.3.1

N/A

8.2.1.2

16-4.2.2

16-4.3.2

N/A

8.2.1.3

16-4.2.3

16-4.3.3

N/A

top of page

Table 17: S-G-03 (rev.1), Part 19 – Densitometers
Table 17: S-G-03 (rev.1), Part 19 – Densitometers
S-G-03 (rev.1) LMB-EG-08 (Section 17) S-G-03 (5.17 Amendments to section 17) Comments
Scope

1.0

17-1

N/A

Units

2.0

N/A

N/A

Metrological requirements

3.0

N/A

N/A

3.1

17-4.3

17-4.4

N/A

Technical requirements

4.0

N/A

N/A

4.1

17-2.1

N/A

4.2

17-2.2

N/A

Marking requirements

5.0

17-3

N/A

5.1

17-3.1

N/A

5.2

17-3.2

N/A

Sealing requirements

6.0

N/A

N/A

S-EG-02

Administrative requirements

7.0

N/A

N/A

NewFoonote 1

Performance tests

8.0

8.1

8.1.1

17-4

N/A

8.1.1.1

17-4.3

8.1.1.2

17-4.4

N/A

8.2

17-4.2

N/A

8.3

17-4.1

N/A

8.4

17-4

N/A

8.4.1

17-4.3

N/A

8.4.2

17-4.4

N/A

top of page

Table 18: S-G-03 (rev.1), Part 20 – Flow conditioners used in gas measurement systems
Table 18: S-G-03 (rev.1), Part 20 – Flow conditioners used in gas measurement systems
S-G-03 (rev.1) S-G-04 Comments
Scope

1.0

1.0

Units

2.0

N/A

Metrological requirements

3.0

N/A

3.1

3.3.7

Technical requirements

4.0

N/A

Marking requirements

5.0

N/A

5.1

5.1.1

4.1

5.2

4.2

5.3

4.3

5.4

4.4

Sealing requirements

6.0

N/A

S-EG-02

Administrative requirements

7.0

N/A

7.1

3.0

7.1.1

3.1.1

3.1.2

7.1.2

3.2.1

7.1.3

3.3

7.1.3.1

3.3.1

7.1.3.2

3.3.2

7.1.3.3

3.3.2.1

7.1.3.4(a)

3.3.3

7.1.3.4(a)(i)

3.3.4

7.1.3.4(b)

3.3.5

7.1.3.4(c)

3.3.6

7.1.4

5.0

7.1.4.1

5.1

7.1.4.2

5.1.1

7.1.4.3

5.1.2

top of page

Table 19: S-G-03 (rev.1), Part 21 – Conditioning orifice plates
Table 19: S-G-03 (rev.1), Part 21 – Conditioning orifice plates
S-G-03 (rev.1) PS-G-16 Comments
Scope

1.0

1.0

Terminology

2.0

3.0

Units

3.0

N/A

Metrological requirements

4.0

4.1.2

4.1

4.1.1

4.1.2

4.1.4

4.2

4.3.1

Technical requirements

5.0

5.1.1

Marking requirements

6.0

6.1

6.1(a)

6.1(e)

6.1(b)

N/A

NewFoonote 1

6.1(c)

6.1(f)

Sealing requirements

7.0

N/A

S-EG-02

Administrative requirements

8.0

8.1

N/A

8.1.1

5.2.5

8.1.2

4.1.5

Performance tests

9.0

4.1.1

4.3.1.1

top of page

Date modified: