Breakdown of current obligations by contractor

Breakdown of current obligations by contractor
Contractor Project Obligation Completed to date In progress To be identified Estimated timeframe
ADGA Group Consultants Land Command Support Systems—Weapon System Management $208,469,594 $179,224,564 $0 $29,245,030 2/8/2010 - 10/4/2019
AirBoss Engineered Products Chemical, Biological, Radiological and Nuclear Respirator—In-Service Support $2,164,166 $0 $0 $2,164,166 11/13/2015 - 10/31/2023
AirBoss Engineered Products Chemical, Biological, Radiological and Nuclear Respirator—Acquisition $25,946,343 $0 $0 $25,946,343 11/13/2015 - 10/31/2023
Airbus Defence and Space Fixed-Wing Search and Rescue Aircraft—Acquisition $1,925,195,879 $169,256,325 $1,755,939,554 $0 1/1/2008 - 12/1/2026
Airbus Defence and Space Fixed-Wing Search and Rescue Aircraft—In-Service Support $578,793,661 $86,844,920 $491,948,741 $0 1/1/2008 - 11/30/2031
Babcock Canada Victoria In-Service Support Contract $1,446,000,000 $1,248,941,114 $0 $197,058,886 7/21/2006 - 6/30/2018
BAE Systems Bofors Halifax Class Ship Modernization—57 mm Gun $76,937,330 $76,937,330 $0 $0 5/31/2007 - 12/31/2018
Bell Helicopter Textron Canada Canadian Coast Guard Helicopter—Medium $102,341,743 $102,341,743 $0 $0 8/20/2012 - 12/18/2021
Bell Helicopter Textron Canada Canadian Coast Guard Helicopters—Light $145,109,073 $103,424,522 $33,665,429 $8,019,122 8/20/2012 - 5/9/2021
Bell Helicopter Textron Canada CH146 Utility Tactical Transport Helicopter—Optimized Weapons System Support $532,047,550 $532,047,550 $0 $0 1/14/2011 - 3/31/2020
Boeing Defence Space and Security C17 Strategic Airlift—Acquisition—5th Aircraft $264,500,000 $264,500,000 $0 $0 10/2/2014 - 12/22/2020
Boeing Defence Space and Security C17 Strategic Airlift—In-Service Support $746,000,000 $548,509,016 $197,490,984 $0 7/6/2006 - 2/1/2035
Boeing Defence Space and Security Medium-to Heavy-Lift Helicopters—Acquisition $1,256,244,839 $1,106,766,117 $149,478,722 $0 7/5/2006 - 6/30/2022
Boeing Defence Space and Security Medium-to Heavy-Lift Helicopters—In-Service Support $581,378,704 $538,847,432 $42,531,272 $0 7/5/2006 - 6/21/2038
Boeing Defence Space and Security Mercury Global Space Segment—Wideband Global Satellite $240,000,000 $240,000,000 $0 $0 4/4/2011 - 4/4/2021
CAE Operational Training Systems Provider—C130J $366,251,368 $206,542,888 $159,708,480 $0 1/25/2007 - 3/31/2033
CAE Operational Training Systems Provider—CH-147 $243,989,527 $98,237,939 $101,955,091 $43,796,497 1/25/2007 - 9/24/2035
Cascade Aerospace CC130 Hercules Avionics—In-Service Support $33,055,343 $15,904,841 $17,150,502 $0 8/23/2007 - 3/31/2022
Cascade Aerospace CC130 Primary Air Vehicle—Optimized Weapon System Management $549,872,662 $549,872,662 $0 $0 10/24/2005 - 3/31/2022
Daimler Armoured Heavy Support Vehicle System $20,528,934 $20,528,934 $0 $0 1/19/2012 - 3/31/2021
DEW Engineering Medium Support Vehicle System Project— Specially Equipped Vehicles—Baseline Shelters $155,052,478 $140,066,059 $14,986,419 $0 6/27/2006 - 8/31/2017
DRS Technologies Land Command Support System—Life Extension—Communications and Power Distribution $44,828,244 $33,318,883 $11,509,361 $0 6/2/2010 - 10/26/2021
FFG Flensburger Fahrzeugbau Gesellschaft Force Mobility Enhancement—Armoured Engineer Vehicles $185,638,371 $141,609,614 $0 $44,028,757 7/17/2009 - 12/31/2020
General Dynamics Mercury Global Ground Segment—In-Service Support $6,067,991 $107,892 $5,960,099 $0 6/12/2012 - 11/6/2021
General Dynamics Land Systems Canada Buffalo and Cougar Armoured Vehicles — In-Service Support $11,750,000 $0 $8,568,750 $3,181,250 4/1/2016 - 3/31/2023
General Dynamics Land Systems Canada Light Armoured Vehicle III Upgrade Project $1,618,401,653 $1,618,401,653 $0 $0 4/6/2010 - 10/21/2020
General Dynamics Land Systems Canada Light Armoured Vehicle—Reconnaissance—Surveillance Systems $306,721,241 $306,721,241 $0 $0 5/28/2012 - 1/31/2021
General Dynamics Land Systems Canada Wheeled Light Armoured Vehicles—Optimized Weapon Systems Support—Phase 2 $1,126,792,845 $1,126,792,845 $0 $0 3/18/2002 - 3/31/2023
General Dynamics Mission Systems Canada Underwater Warfare Sensor Suite Upgrade Acquisition and In-Service Support $94,023,219 $0 $94,023,219 $0 7/5/2012-6/28/2028
General Dynamics Mission Systems Canada Combat Net Radio Enhanced—Acquisition $165,101,776 $138,594,382 $0 $26,507,394 3/25/2013 - 12/31/2020
General Dynamics Mission Systems Canada Combat Net Radio Enhanced — In-Service Support $33,867,771 $5,555,982 $28,311,789 $0 3/25/2013 - 3/31/2025
General Dynamics Mission Systems Canada CP-140 Aurora — Data Management System—Block IV $285,111,825 $239,996,853 $0 $45,114,972 12/1/2013 - 10/15/2022
General Dynamics Mission Systems Canada Land C4ISR Sustainment Project — Cyber Security Engineering Services $50,000,000 $0 $13,650,000 $36,350,000 2/9/2017 - 10/21/2025
General Dynamics Mission Systems Canada Land C4ISR Sustainment Project—Engineering and Integration $325,000,000 $0 $59,955,000 $265,045,000 2/9/2017 - 10/21/2025
General Dynamics Mission Systems Canada Land C4ISR Sustainment Project—Software Support $175,000,000 $0 $33,029,997 $141,970,003 2/9/2017 - 10/21/2025
General Dynamics Mission Systems Canada Land Command Support System—Engineering and Integration In-Service Support $750,000,000 $750,000,000 $0 $0 1/30/2008 - 2/5/2019
General Dynamics Mission Systems Canada Mercury Global Ground Segment—Design and Build $54,161,080 $45,619,695 $8,541,385 $0 6/1/2012 - 11/7/2019
General Dynamics Mission Systems Canada Mercury Global—Strategic Deployable Terminals $28,257,799 $0 $4,836,550 $23,421,249 1/28/2015 - 2/22/2020
Harris Electronic Systems Maritime Satellite Communications Upgrade $25,012,840 $25,012,840 $0 $0 4/10/2015 - 2/16/2023
Hensoldt Sensors Area Surveillance Radar/Secondary Surveillance Radar $77,530,279 $77,530,279 $0 $0 11/3/2010 - 3/21/2021
IMP Aerospace CP-140 Aurora System Support—Airframe In-Service Support $533,750,000 $533,750,000 $0 $0 6/30/2005 - 3/31/2020
Irving Shipbuilding Arctic Offshore Patrol Ships $3,068,962,205 $1,407,962,287 $353,266,934 $1,307,732,984 9/1/2010 - 1/31/2026
Irving Shipbuilding Halifax Class Ship Modernization—Shipyard East $899,968,183 $637,937,574 $50,112,426 $211,918,183 4/5/2007 - 1/31/2018
L3 Technologies ES CP 140 Aurora System Support—Avionics $271,359,270 $271,359,270 $0 $0 6/30/2005 - 3/31/2024
L3 Technologies MAPPS Halifax Class Ship Modernization—Integrated Platform Management System $80,485,478 $80,485,478 $0 $0 2/23/2007 - 12/31/2018
L3 Technologies MAS CF-18 Primary Air Vehicle—Optimized Weapon System Management $487,784,761 $487,784,761 $0 $0 7/11/2011 - 3/31/2019
Lockheed Martin Aeronautics C130J Tactical Airlift—In-Service Support 2 $708,676,610 $83,382,459 $569,710,429 $55,583,722 2/23/2015 - 12/18/2024
Lockheed Martin Aeronautics C130J Tactical Airlift—In-Service Support $924,687,329 $661,240,285 $263,447,044 $0 7/5/2006 - 6/30/2020
Lockheed Martin Aeronautics CP-140 Aurora Structural Life Extension Project $266,025,922 $240,181,073 $25,844,849 $0 11/13/2008 - 6/30/2020
Lockheed Martin Canada Halifax Class Ship Modernization—Combat Systems In-Service Support $378,643,008 $122,979,666 $82,320,334 $173,343,008 3/25/2005 - 3/31/2019
Lockheed Martin Canada  Halifax Class Ship Modernization—Combat Systems Integrator $1,622,842,917 $1,622,842,917 $0 $0 3/21/2005 - 3/31/2019
Lockheed Martin Missiles And Fire Control CF-18 AMIRS (Advanced Multi-Role Infrared Sensor)—In-Service Support $29,147,221 $29,147,221 $0 $0 11/28/2005 - 12/31/2020
Lockheed Martin Overseas Corporation Victoria Class Command and Control System—In-Service Support $18,270,000 (USD) $0 (USD) $8,369,686 (USD) $9,900,314 (USD) 3/16/2016 - 12/4/2023
Macdonald Dettwiler And Associates CP-140 Aurora—Imaging Radar System $374,270,251 $356,299,787 $0 $17,970,464 5/23/2002 - 5/31/2022
Macdonald Dettwiler And Associates Joint Space Support Project—Acquisition $28,609,896 $27,744,189 $0 $865,707 3/13/2009 - 11/30/2020
Macdonald Dettwiler And Associates Joint Space Support Project—In-Service Support $11,928,731 $11,928,731 $0 $0 3/13/2009 - 5/13/2018
Macdonald Dettwiler And Associates Polar Epsilon 2 $57,593,968 $11,245,032 $27,258,751 $19,090,185 8/31/2013 - 6/13/2023
Mack Defence Medium Support Vehicle System—Standard Military Pattern—Acquisition $707,210,363 $410,469,739 $296,740,624 $0 6/27/2006 - 6/11/2020
Mack Defence Medium Support Vehicle System—Standard Military Pattern—In-Service Support $42,967,329 $12,248,303 $21,340,478 $9,378,548 6/27/2006 - 6/11/2022
Magellan Aerospace CF-18 Aircraft Engine—Interim In-Service Support $49,040,465 $49,040,465 $0 $0 12/30/2013 - 6/30/2020
Magellan Aerospace CF-18 Engines—F404 Long-term In-Service Support $106,434,421 $15,286,377 $91,148,044 $0 12/18/2014 - 1/11/2025
Mercedes Benz Canada Light Utility Vehicle Wheeled—In-Service Support $53,923,709 $53,923,709 $0 $0 3/18/2008 - 3/31/2021
Peraton CF-18 Avionics—Optimized Weapon System Support $293,937,000 $126,625,308 $0 $167,311,692 7/23/2008 - 3/31/2020
Raytheon Canada Naval Remote Weapon Station $37,191,779 $10,543,976 $25,771,480 $876,323 4/12/2012 - 1/31/2023
Raytheon Canada Phalanx Naval Weapon System—In-Service Support  $330,038,170 $0 $188,400,000 $141,638,170 5/27/2016 - 11/23/2027
Rheinmetall Canada Integrated Soldier System Optimised Weapons System Support $6,254,141 $1,813,045 $4,441,096 $0 5/29/2009 - 3/26/2022
Rheinmetall Canada Integrated Soldier System Project $61,932,961 $35,636,827 $334,865 $25,961,269 5/29/2009 - 6/23/2021
Rheinmetall Canada Land C4ISR Sustainment Project—ISTAR $50,000,000 $0 $20,266,380 $29,733,620 2/9/2017 - 10/21/2025
Rheinmetall Canada Land Command Support Systems—Life Extensions–Satellite On The Move $20,831,634 $17,552,625 $3,279,009 $0 5/11/2012 - 9/15/2019
Rheinmetall Canada Medium Range Radar—Acquisition $138,500,782 $127,633,954 $0 $10,866,828 3/3/2008 - 8/1/2022
Rheinmetall Canada Medium Range Radar—In-Service Support $8,406,404 $1,658,333 $6,533,264 $214,807 3/3/2008 - 8/1/2022
Rheinmetall Waffe Munition Halifax Class Ship Modernization—Shield Countermeasures $35,433,468 $33,998,458 $1,435,010 $0 12/6/2006 - 12/18/2018
Saab Microwave Systems Canada Halifax Class Frigates—Antenna Replacement $21,600,000 $0 $21,600,000 $0 06/30/2016 - 10/31/2025
Seaspan Vancouver Shipyards Joint Support Ship $440,915,504 $183,434,996 $158,693,073 $98,787,435 9/1/2010 - 12/31/2021
Seaspan Vancouver Shipyards Offshore Fisheries Science Vessels—Construction $579,239,804 $545,569,646 $33,670,158 $0 9/1/2010 - 5/22/2020
Seaspan Vancouver Shipyards Offshore Oceanographic Science Vessel $34,112,019 $0 $32,342,107 $1,769,912 9/1/2010 - 9/2/2020
Seaspan Victoria Shipyards Halifax Class Ship Modernization—Shipyard West $580,900,000 $502,059,681 $5,098,206 $73,742,113 4/5/2007 - 12/31/2018
Sikorsky Aircraft Maritime Helicopter Project—Acquisition $2,047,437,629 $2,047,437,629 $0 $0 8/8/2000 - 11/22/2021
Sikorsky Aircraft Maritime Helicopter Project—In-Service Support $2,769,384,372 $1,837,977,450 $728,689,609 $202,717,313 8/1/2000 - 3/31/2028
Standard Aero C130-CP140 Aircraft Engine—Long Term In-Service Support $107,282,053 $5,996,757 $53,548,590 $47,736,706 12/18/2014 - 1/11/2025
Standard Aero C130-CP-140 Aircraft Engine—Interim In-Service Support $52,719,728 $52,719,728 $0 $0 10/30/2012 - 6/30/2019
Textron Systems Canada Tactical Armoured Patrol Vehicle—Acquisition $673,616,212 $383,027,306 $290,588,906 $0 7/8/2009 - 6/7/2018
Textron Systems Canada Tactical Armoured Patrol Vehicle—In-Service Support $105,960,425 $26,968,352 $56,226,694 $22,765,379 7/8/2009 - 6/7/2022
Thales Joint Venture Canada/Australia Arctic Offshore Patrol Ship and the Joint Support Ship—In-Service Support $4,821,650 $4,821,650 $0 $0 8/17/2012 - 12/1/2027
Top Aces Contracted Airborne Training Services $407,680,394 $0 $407,680,394 $0 9/14/2009 - 3/31/2032
Weatherhaven Headquarters Shelter Systems—Acquisition $170,031,829 $6,532,399 $163,499,430 $0 8/17/2012 - 1/13/2022
Weatherhaven Headquarters Shelter Systems—In-Service Support $12,044,381 $49,945 $11,994,436 $0 8/17/2012 - 1/13/2022
Total $34,581,402,942 $23,817,353,503 $7,239,368,567 $3,524,680,873  

Notes:

  1. The Report on contractor progress does not include information for contracts that have not yet been publicly released
  2. Contractors may temporarily over-achieve or over-identify activities as they manage their current obligations. These overages are not reflected in the report.
  3. Some contracts, particularly in the maintenance area, have an obligation value that reflect current activities to date. These values may increase to a maximum ceiling value based on the level of work performed every year.
  4. In cases where the estimated end date has passed and the obligation is at or near completion, annual reports have been received and the verification process is underway to confirm completion of the obligation.
  5. In cases where there are no values under "Completed to date", the project is recently contracted and the first cycle of annual reporting has not yet been completed.
  6. All project values are in $CAD with the exception of Victoria Class Command and Control System - In-Service Support, which value is shown in $USD.

Column Definitions:

Project
a brief description of the equipment or service being purchased by the Government of Canada
Contractor
the company that has been awarded a contract by the Government of Canada.
Obligation
the value of the contractor's IRB/ITB obligation on the contract.
Completed
the value of the contractor's IRB/ITB business activities in Canada that are complete.
In Progress
the value of the contractor's IRB/ITB business activities in Canada that are currently underway.
Not Identified
the value of the contractor's IRB/ITB obligation for which specific business activities have not yet been identified.  
Estimated timeframe
the timeframe within which the contractor must fulfill its IRB/ITB obligation on the contract.
Date modified: