Connect to Innovate Program – Project status updates
This page provides information about the status of Connect to Innovate (CTI) high-speed Internet projects in each community where they will be providing service.
The following table displays the status of announced CTI projects with finalized contribution agreements. Announced projects not listed in this table are still under negotiation and will be added once the details of their agreements have been finalized. Updates to this table will occur on a quarterly basis in March, June, September, and December.
Helpful links
- Glossary: Connect to Innovate
- National Broadband Internet Service Availability Map (coverage and projects in your area)
- Connect to Innovate – Frequently asked questions

Communities connected by 2023
Connected to date |
50 |
---|---|
December 2020 | 100 |
December 2021 | 750 |
March 2023 | 975 |

Impacted households by 2023
Connected to date |
28,000 |
---|---|
December 2020 | 35,000 |
December 2021 | 250,000 |
March 2023 | 390,000 |

Number of agreements
Status of contribution agreements | Number of agreements |
---|---|
Under negotiation | 29 |
Planning, detailed design and construction stage | 69 |
Operational | 7 |
975+
communities to be connected
190
Indigenous communities to be connected
390,000
households in communities with improved connectivity
1200
anchor institutions with improved connectivity
22,500km
of fibre will be installed
$563M
Total CTI contribution funding
You can search for projects in your province or by project status by entering it into the filter field below.
Filter Options
Province or territory |
Communities Footnote 1 |
Project name Footnote 2 |
Project description Footnote 3 |
Total CTI funding Footnote 4 |
Project start date Footnote 5 |
Current stageFootnote 6 |
Expected construction completion date Footnote 7 |
---|---|---|---|---|---|---|---|
Alberta | Abee | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
Alberta | Atmore | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Beaver Lake | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Bellis | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
Alberta | Birchcliff | Missing Link Internet Inc | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the region of Sylvan Lake, Alberta. | $1,326,882 | 2018-10-01 | Detailed Design and Construction | 2020-06-30 |
Alberta | Blackfoot | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2020-12-31 |
Alberta | Bondiss | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Campsie | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
Alberta | Cherry Grove | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Colinton | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Collingwood Cove | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Coronado | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
Alberta | Eagles Quay | Missing Link Internet Inc | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the region of Sylvan Lake, Alberta. | $1,326,882 | 2018-10-01 | Detailed Design and Construction | 2020-06-30 |
Alberta | Egremont | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
Alberta | Fort Chipewyan | Arrow Technology Group GP Limited | Backbone network using microwave technology to enhance broadband capacity to two communities in the region of Fort Chipewyan, Alberta. | $768,150 | 2019-05-01 | Operational | 2019-12-31 |
Alberta | Fort Kent | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Fort Kent | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Fox Lake (Little Red River Cree Nation) | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the regions of the MacKenzie County and Wood Buffalo, Alberta. | $4,245,426 | 2018-09-01 | Operational | 2019-06-30 |
Alberta | Garden Creek | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the regions of the MacKenzie County and Wood Buffalo, Alberta. | $4,245,426 | 2018-09-01 | Operational | 2019-06-30 |
Alberta | Half Moon Bay | Missing Link Internet Inc | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the region of Sylvan Lake, Alberta. | $1,326,882 | 2018-10-01 | Detailed Design and Construction | 2020-06-30 |
Alberta | Half Moon Estates | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Hilliard | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
Alberta | Jarvis Bay | Missing Link Internet Inc | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the region of Sylvan Lake, Alberta. | $1,326,882 | 2018-10-01 | Detailed Design and Construction | 2020-06-30 |
Alberta | John D'Or Prairie | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the regions of the MacKenzie County and Wood Buffalo, Alberta. | $4,245,426 | 2018-09-01 | Operational | 2019-06-30 |
Alberta | La Glace | GPNetworks | Backbone network using fibre optic technology to enhance broadband capacity to one community in northwestern Alberta. | $986,657 | 2019-09-30 | Operational | 2019-12-31 |
Alberta | Larkspur | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Leavitt | Cardston County | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Mountain View Region of Southwest Alberta. | $211,775 | 2019-01-21 | Operational | 2020-03-31 |
Alberta | Mewatha Beach | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Mikisew Cree | Arrow Technology Group GP Limited | Backbone network using microwave technology to enhance broadband capacity to two communities in the region of Fort Chipewyan, Alberta. | $768,150 | 2019-05-01 | Operational | 2019-12-31 |
Alberta | Norglenwold | Missing Link Internet Inc | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the region of Sylvan Lake, Alberta. | $1,326,882 | 2018-10-01 | Detailed Design and Construction | 2020-06-30 |
Alberta | O'Chiese | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to three communities, O'Chiese, Peavine Metis Settlement and Sunchild First Nation, in Alberta. | $2,369,186 | 2020-04-01 | Planning | 2020-12-31 |
Alberta | Peavine Metis Settlement | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to three communities, O'Chiese, Peavine Metis Settlement and Sunchild First Nation, in Alberta. | $2,369,186 | 2020-04-01 | Planning | 2020-12-31 |
Alberta | Pelican Narrows | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Pibroch | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Pickardville | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Rossian | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Spedden | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Sunbreaker Cove | Missing Link Internet Inc | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the region of Sylvan Lake, Alberta. | $1,326,882 | 2018-10-01 | Detailed Design and Construction | 2020-06-30 |
Alberta | Sunchild First Nation | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to three communities, O'Chiese, Peavine Metis Settlement and Sunchild First Nation, in Alberta. | $2,369,186 | 2020-04-01 | Planning | 2020-12-31 |
Alberta | Tallcree | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to two communities in northwestern Alberta. | $2,031,671 | 2018-09-01 | Operational | 2019-06-30 |
Alberta | Tallcree (Tallcree Tribal Government) | Arrow Technology Group LP Limited | Backbone network using fibre optic technology to enhance broadband capacity to two communities in northwestern Alberta. | $2,031,671 | 2018-09-01 | Operational | 2019-06-30 |
Alberta | Therien | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Alberta | Valhalla Centre | GPNetworks | Backbone network using fibre optic technology to enhance broadband capacity to one community in Grande Prairie County, Alberta. | $986,657 | 2019-09-30 | Operational | 2019-12-31 |
Alberta | Venice | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Alberta | Warspite | Buried Glass Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 25 communities in the central and northeastern regions in Alberta. | $7,336,912 | 2018-06-01 | Planning | 2021-03-31 |
British Columbia | Ahousaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Arras | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Barney's Bar | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Beecher Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Bella Bella (Heiltsuk) | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Bella Coola | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Birken | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Black Point | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Blind Channel | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Bliss Landing | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Bloedel | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Bold Point | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Bull Harbour (Tlatlasikwala) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Ceepeecee | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Chehalis (Sts'ailes) | Sts'ailes | Backbone network using fibre optic technology to enhance broadband capacity to one community in the region of Fraser Valley, British Columbia. | $132,030 | 2018-09-15 | Operational | 2018-12-31 |
British Columbia | Coal Harbour | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Da'naxda'xw First Nation | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Ditidaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Dodge Cove | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Dokie Siding | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Earls Cove | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Echo Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Egmont | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Ehatis 11 (Ehattesaht) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Ehattesaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Elk Bay | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Esperanza | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Gillies Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Gold River | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Granite Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Gwawaenuk Tribe | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Hartley Bay (Gitga'at First Nation) | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Hasler Flat | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Health Bay (Kwikwasut'inuxw Haxwa'mis) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Hesquiaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Hesquiat | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Holberg | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Huu-ay-aht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Huu-ay-aht First Nations | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Hyde Creek | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Kingcome (Dzawada'enuxw First Nation) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Kitkatla (Gitxaala Nation) | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Klahoose First Nation | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Klemtu (Kitasoo) | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Kwakiutl | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Kyuquot (Ka:'yu:'k't'h'/Che:k:tles7et'h' First Nations) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Lasqueti | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Lax Kw'alaams | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Lemoray | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Lower Hat Creek 2 (Bonaparte) | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Lyackson | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Mahatta River | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Mamalilikulla-Qwe'Qwa'Sot'Em (Mamalilikulla First Nation) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Marktosis | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Martin Valley | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | McLeod Lake | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Mitchell Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Mowachaht/Muchalaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Musgrave Landing | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Myrtle Point | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Nenagwas (Tlowitsis Nation) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | New Brighton | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Nuchatlaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Ocean Falls | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Old Massett (Old Massett Village Council) | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Oona River | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Opitsat (Tla-o-qui-aht First Nations) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Oweekeno (Wuikinuxv Nation) | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Pacheedaht First Nation | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Pavilion (Ts'kw'aylaxw First Nation) | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Penelakut (Penelakut Tribe) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Pine Valley | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Pinetree | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Port Neville | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Progress | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Quatsino | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Quatsino First Nation | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Read Island | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Refuge Cove | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | River Jordan | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Rock Bay | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Rumble Beach | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Salmon Valley | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Saltery Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Sandspit | Gwaii Communications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to seven communities and reach underserved households in the region of Haida Gwaii, British Columbia. | $3,880,386 | 2017-08-01 | Detailed Design and Construction | 2019-03-31 |
British Columbia | Saturna | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Seaford | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Seton Lake | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Shawl Bay | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Shearwater | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Skidegate Landing | Gwaii Communications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to seven communities and reach underserved households in the region of Haida Gwaii, British Columbia. | $3,880,386 | 2017-08-01 | Detailed Design and Construction | 2019-03-31 |
British Columbia | Sliammon (Tla'amin Nation) | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Sointula | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Summit Lake | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Surge Narrows | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Tahsis | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Telegraph Cove | City West Cable & Telephone Corp. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities around the central and northern region of Vancouver Island. | $6,463,197 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Tla-o-qui-aht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Toquaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Ts'kw'aylaxw | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Uchucklesaht | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-12-31 |
British Columbia | Upper Hat Creek 1 (Bonaparte) | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Van Anda | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-12-31 |
British Columbia | Village of Queen Charlotte | Gwaii Communications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to seven communities and reach underserved households in the region of Haida Gwaii, British Columbia. | $3,880,386 | 2017-08-01 | Detailed Design and Construction | 2019-03-31 |
British Columbia | Wabi Hill | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to ten communities in the region of Prince George to Dawson Creek, British Columbia. | $9,370,032 | 2018-11-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Whaletown | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Williams Beach | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Winter Harbour | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
British Columbia | Xaxli'p | Shaw Cablesystems G.P. | Backbone network using fibre optic technology to enhance broadband capacity to seven communities in the region of Squamish-Lillooet and Thompson-Nicola, British Columbia. | $2,065,032 | 2018-09-01 | Detailed Design and Construction | 2020-12-31 |
British Columbia | Yaculta | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2021-09-30 |
British Columbia | Yuquot | Strathcona Regional District | Backbone network using fibre optic technology to enhance broadband capacity to seventy communities around the southern region of Vancouver Island. | $15,665,005 | 2018-01-01 | Planning | 2022-09-30 |
Manitoba | Anama Bay (Dauphin River) | Broadband Communications North Inc. (BCN) | Backbone and last mile network using fibre optic and fixed wireless technology to enhance broadband capacity to six communities and underserved households in the North Interlake, North East and Flin Flon region of Manitoba. | $672,700 | 2019-04-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Berens River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Blumenfeld | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Blumenort South | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Carman | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-06-30 |
Manitoba | Chortitz | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Dallas | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Fisher Branch | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Fisher River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Friedensfeld West | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-06-30 |
Manitoba | Friedensruh | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Gnadenfeld | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Gnadenthal | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Grand Rapids (Misipawistik Cree Nation) | Broadband Communications North Inc. (BCN) | Backbone and last mile network using fibre optic and fixed wireless technology to enhance broadband capacity to six communities and underserved households in the North Interlake, North East and Flin Flon region of Manitoba. | $672,700 | 2019-04-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Gretna | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Haskett | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Hochfeld | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Horndean | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Jackhead (Kinonjeoshtegon First Nation) | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Lake St. Martin | Broadband Communications North Inc. (BCN) | Backbone and last mile network using fibre optic and fixed wireless technology to enhance broadband capacity to six communities and underserved households in the North Interlake, North East and Flin Flon region of Manitoba. | $672,700 | 2019-04-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Little Grand Rapids | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Little Saskatchewan | Broadband Communications North Inc. (BCN) | Backbone and last mile network using fibre optic and fixed wireless technology to enhance broadband capacity to six communities and underserved households in the North Interlake, North East and Flin Flon region of Manitoba. | $672,700 | 2019-04-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Lowe Farm | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Neubergthal | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Neuenburg | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Neuhorst | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Osterwick | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Pauingassi First Nation | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Peguis | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Pinaymootang First Nation | Broadband Communications North Inc. (BCN) | Backbone and last mile network using fibre optic and fixed wireless technology to enhance broadband capacity to six communities and underserved households in the North Interlake, North East and Flin Flon region of Manitoba. | $672,700 | 2019-04-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Reinfeld | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-06-30 |
Manitoba | Reinland | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Riverside | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-03-31 |
Manitoba | Roland | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Rosenfeld | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Rosengart | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Rosenort | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2019-12-31 |
Manitoba | Rosetown | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Schoenwiese | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | Sommerfeld | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-12-31 |
Manitoba | St. Jean Baptiste | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | St. Joseph | Valley Fiber Limited | Deploy a new backbone network to improve broadband capacity to 33 communities in the region of Pembina Valley in Southern Manitoba. | $10,253,862 | 2018-08-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | St. Martin Junction | Broadband Communications North Inc. (BCN) | Backbone and last mile network using fibre optic and fixed wireless technology to enhance broadband capacity to six communities and underserved households in the North Interlake, North East and Flin Flon region of Manitoba. | $672,700 | 2019-04-01 | Detailed Design and Construction | 2020-09-30 |
Manitoba | Vidir | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to nine communities in northeastern Manitoba. | $2,598,705 | 2018-10-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Bains Corner | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Kings County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Bonny River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Charlotte County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Davidson Lake | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in York County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Fairfield | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Kings County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Jemseg | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Queens County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
New Brunswick | McDonald Corner | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Queens County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
New Brunswick | Parkindale | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Kent and Albert Counties in New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Rollingdam | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Charlotte County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | South Branch | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Kent and Albert Counties in New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Southfield | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Kings County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Upham | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Kings County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
New Brunswick | Upper Hainesville | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in York County, New Brunswick. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Admirals Beach | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Bacon Cove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to five communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Baie Verte | Bell Canada | Backbone network using fibre optic technology to upgrade and provide resiliency broadband to two communities in the Baie Verte Peninsula region of Newfoundland & Labrador. | $852,035 | 2018-11-01 | Operational | 2019-09-30 |
Newfoundland and Labrador | Bear Cove | Bell Canada | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two communites and partially served households in the Northern Peninsula — St. Anthony region of Newfoundland & Labrador. | $709,200 | 2018-10-01 | Operational | 2019-09-30 |
Newfoundland and Labrador | Burgoynes Cove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Burnside | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Cappahayden | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to five communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Capstan Island | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Cartwright | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Change Islands | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to one community in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Charlottetown | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Conche | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Northern Peninsula — St. Anthony region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Newfoundland and Labrador | Cook's Harbour | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Northern Peninsula — St. Anthony region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Cormack | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Cottrell's Cove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Croque | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communtites in northeastern Newfoundland & Labrador. | $349,883 | 2020-01-13 | Detailed Design and Construction | 2021-03-31 |
Newfoundland and Labrador | English Harbour East | Bell Canada | Backbone and last-mile network using fibre optic technology to enhance broadband capacity to two communities and households in the Burin Peninsula-Marystown, Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Fair Haven | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to five communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Fleur de Lys | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one communtity in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Newfoundland and Labrador | Forteau | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Fortune Harbour | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Fox Harbour | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Gallants | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Gaultois | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to one community in the Channel-Port aux Basques region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Grand Le Pierre | Bell Canada | Backbone and last-mile network using fibre optic technology to enhance broadband capacity to two communities and households in the Burin Peninsula-Marystown, Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-03-31 |
Newfoundland and Labrador | Grey River | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to two communities in the Channel-Port aux Basques region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Harcourt | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Hopedale | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to six communities in the Labrador — Happy Valley — Goose Bay and Nunatsiavut — Nain region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Island Harbour | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Jack Ladder | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Jackson's Arm | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Jamestown | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-03-31 |
Newfoundland and Labrador | Kitchuses | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to five communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | L'Anse au Loup | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | L'Anse-au-Clair | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Laurenceton | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Little Harbour East | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to five communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Lodge Bay | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Makkovik | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to six communities in the Labrador — Happy Valley — Goose Bay and Nunatsiavut — Nain region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Mary's Harbour | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | McCallum | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to one community in the Channel-Port aux Basques region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Miles Cove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-03-31 |
Newfoundland and Labrador | Ming's Bight | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one communtity in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-03-31 |
Newfoundland and Labrador | Monroe | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Mud Lake | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to one community in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. |
$27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Newfoundland and Labrador | Nain | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to six communities in the Labrador — Happy Valley — Goose Bay and Nunatsiavut — Nain region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Natuashish | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to six communities in the Labrador — Happy Valley — Goose Bay and Nunatsiavut — Nain region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Newtown | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | O'Donnells | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Avalon Peninsula — St. John's region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Petit Forte | Bell Canada | Backbone network using fibre optic and microwave technology to two communities in the Burin Peninsula-Marystown region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-03-31 |
Newfoundland and Labrador | Pinware | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Pollards Point | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | Port Albert | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Port Anson | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-03-31 |
Newfoundland and Labrador | Port Hope Simpson | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Postville | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to six communities in the Labrador — Happy Valley — Goose Bay and Nunatsiavut — Nain region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Ramea | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to two communities in the Channel-Port aux Basques region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Newfoundland and Labrador | Red Bay | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Rencontre East | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to one community in the Channel-Port aux Basques region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-03-31 |
Newfoundland and Labrador | Rigolet | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to six communities in the Labrador — Happy Valley — Goose Bay and Nunatsiavut — Nain region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Rocky Harbour | Bell Canada | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two communites and partially served households in the Northern Peninsula — St. Anthony region of Newfoundland & Labrador. | $709,200 | 2018-10-01 | Operational | 2019-09-30 |
Newfoundland and Labrador | Seldom-Little Seldom | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in the Notre Dame Bay — Lewisporte region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Sop's Arm | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-09-30 |
Newfoundland and Labrador | Southeast Bight | Bell Canada | Backbone network using fibre optic and microwave technology to two communities in the Burin Peninsula-Marystown region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-03-31 |
Newfoundland and Labrador | St. Alban's | Bell Canada | Backbone network using fibre optic technology to upgrade and provide resiliency broadband to two communities in the Baie Verte Peninsula region of Newfoundland & Labrador. | $852,035 | 2018-11-01 | Operational | 2019-09-30 |
Newfoundland and Labrador | St. Brendan's | Bell Canada | Backbone network using microwave technology to enhance broadband capacity to one community in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | St. Chads | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | St. Julien's | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communtites in northeastern Newfoundland & Labrador. | $349,883 | 2020-01-13 | Detailed Design and Construction | 2021-03-31 |
Newfoundland and Labrador | St. Lewis | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | The Beaches | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in the Humber District — Corner Brook region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Newfoundland and Labrador | West St. Modeste | Bell Canada | Backbone network using fibre optic and microwave technology to enhance broadband capacity to thirteen communities in the Labrador — Happy Valley — Goose Bay region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-06-30 |
Newfoundland and Labrador | Winter Brook | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to six communities in the Bonavista/Trinity — Clarenville region of Newfoundland & Labrador. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-06-30 |
Nova Scotia | Apple River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Cumberland County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Ashdale | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Hants County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Bayport | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Lunenburg County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Nova Scotia | Bayswater | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Lunenburg County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Blue Mountain | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Pictou County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Central Chebogue | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three community in Yarmouth County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-03-31 |
Nova Scotia | Chignecto | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Cumberland County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Clementsvale | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Annapolis County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Diligent River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Cumberland County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | East Ferry | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Digby, Nova Scotia. | $129,525 | 2020-04-20 | Planning | 2020-12-31 |
Nova Scotia | East Walton | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Hants County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Eden Lake | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Pictou County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Feltzen South | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Lunenburg County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Nova Scotia | Fourchu | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Richmond County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Gavelton | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to one community in Yarmouth County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-03-31 |
Nova Scotia | Glooscap First Nation | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Kings County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-03-31 |
Nova Scotia | Greenfield | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three commuities in Queens County and one community in Annapolis County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Gunning Cove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | Halfway River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Cumberland County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Ingomar | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | Kingsburg | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Lunenburg County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Nova Scotia | Little River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Digby, Nova Scotia. | $129,525 | 2020-04-20 | Planning | 2020-12-31 |
Nova Scotia | Lochaber | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two commuities in Antigonish County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Maitland Bridge | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three commuities in Queens County and one community in Annapolis County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | McPhersons Mills | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Pictou County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Middlefield | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three commuities in Queens County and one community in Annapolis County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Minasville | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Hants County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | New Salem | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Cumberland County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Newellton | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | North East Harbour | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | North Lochaber | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two commuities in Antigonish County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Northwest Cove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Lunenburg County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Petite Rivière | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to one community in Lunenburg County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Nova Scotia | Pleasant River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three commuities in Queens County and one community in Annapolis County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Prospect | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Halifax region of Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-03-31 |
Nova Scotia | Roseway | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | Sandford | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to one community in Lunenburg County, Nova Scotia. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-03-31 |
Nova Scotia | Scots Bay | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Kings County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | South Side | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | St. Margaret Village | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Victoria County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Nova Scotia | Stoney Island | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | The Hawk | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to four communities in Shelbourne County, Nova Scotia. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2020-09-30 |
Nova Scotia | Upper Blandford | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Lunenburg County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Nova Scotia | Virginia East | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communities in Annapolis County, Nova Scotia. | $27,241,450 | 2017-05-01 | Planning | 2020-12-31 |
Northwest Territories | Fort McPherson | Government of Yukon | Backbone network using fibre optic technology to enhance broadband resiliency to four communities in the Northwest Territories and Yukon. | $30,000,000 | 2018-06-01 | Detailed Design and Construction | 2021-03-31 |
Northwest Territories | Inuvik (Inuvik Native) | Government of Yukon | Backbone network using fibre optic technology to enhance broadband resiliency to four communities in the Northwest Territories and Yukon. | $30,000,000 | 2018-06-01 | Detailed Design and Construction | 2021-03-31 |
Northwest Territories | Jean Marie River First Nation | Northwestel Inc. | Backbone network using fibre optic technology to enhance broadband capacity to the Jean Marie River First Nation in the Dehcho Region, Northwest Territories. | $921,278 | 2019-05-01 | Operational | 2019-12-31 |
Northwest Territories | Tsiigehtchic (Gwichya Gwich'in) | Government of Yukon | Backbone network using fibre optic technology to enhance broadband resiliency to four communities in the Northwest Territories and Yukon. | $30,000,000 | 2018-06-01 | Detailed Design and Construction | 2021-03-31 |
Nunavut | Arctic Bay | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Arviat | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Baker Lake | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Cambridge Bay (Iqaluktuuttiaq) | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Cape Dorset | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Chesterfield Inlet | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Clyde River | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Coral Harbour | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Detailed Design and Construction | 2018-12-31 |
Nunavut | Gjoa Haven | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Grise Fiord | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Hall Beach (Sanirajak) | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Igloolik | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Iqaluit | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Kimmirut | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Kugaaruk | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Kugluktuk | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Naujaat (Repulse Bay) | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Detailed Design and Construction | 2018-12-31 |
Nunavut | Pangnirtung | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Detailed Design and Construction | 2018-12-31 |
Nunavut | Pond Inlet | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Qikiqtarjuaq | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Rankin Inlet | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Resolute Bay | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Sanikiluaq | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Taloyoak | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Nunavut | Whale Cove | Northwestel Inc. | Backbone network using satellite technology to enhance broadband capacity to 25 communities in Nunavut. | $49,900,000 | 2017-01-01 | Operational | 2018-12-31 |
Ontario | Actinolite | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-12 |
Ontario | Anishnaabeg of Naongashiing | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in six communities in the Kenora and Rainy River region of Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2020-09-30 |
Ontario | Attawapiskat | The Western James Bay Telecom Network | Backbone and last-mile network using fibre optic technology to uprade broadband capacity to three communities and households in the region of southwestern James Bay, Ontario. | $441,193 | 2018-09-14 | Detailed Design and Construction | 2019-03-31 |
Ontario | Batawa | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Beech Beach | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in three communities in northwestern Ontario. | $7,908,968 | 2019-01-01 | Operational | 2020-06-30 |
Ontario | Corbyville | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Detailed Design and Construction | 2021-04-20 |
Ontario | Deloro | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-12 |
Ontario | Eldorado | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-12 |
Ontario | Fort Albany (Albany) | The Western James Bay Telecom Network | Backbone and last-mile network using fibre optic technology to uprade broadband capacity to three communities and households in the region of southwestern James Bay, Ontario. | $441,193 | 2018-09-14 | Detailed Design and Construction | 2019-03-31 |
Ontario | Fort Hope (Eabametoong First Nation) | Rapid Lynx Telecommunications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to five communities as well as a last mile network in the Matawa first Nation communities in in the Ring of Fire region of Ontario. | $37,100,000 | 2019-04-04 | Planning | 2020-12-31 |
Ontario | Fort Severn | Keewaytinook Okimakanak | Backbone network using satellite technology to enhance broadband capacity to two communities in the region of Northwestern Ontario. | $5,629,990 | 2018-09-01 | Operational | 2019-03-31 |
Ontario | Georgina Island (Chippewas of Georgina Island) | The Regional Municipality of York | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the York region of Ontario. | $2,000,000 | 2019-05-31 | Planning | 2022-12-31 |
Ontario | Hilton Beach | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in three communities in northwestern Ontario. | $7,908,968 | 2019-01-01 | Operational | 2020-06-30 |
Ontario | Ivanhoe | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Detailed Design and Construction | 2021-04-20 |
Ontario | Kashechewan | The Western James Bay Telecom Network | Backbone and last-mile network using fibre optic technology to uprade broadband capacity to three communities and households in the region of southwestern James Bay, Ontario. | $441,193 | 2018-09-14 | Detailed Design and Construction | 2019-03-31 |
Ontario | Kejick (Iskatewizaagegan #39 Independent First Nation) | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in six communities in the Kenora and Rainy River region of Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2020-09-30 |
Ontario | Lonsdale | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Detailed Design and Construction | 2021-04-20 |
Ontario | Lovett | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Madsen | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in six communities in the Kenora and Rainy River region of Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2020-09-30 |
Ontario | Marlbank | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Martin Falls (Ogoki) | Rapid Lynx Telecommunications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to five communities as well as a last mile network in the Matawa first Nation communities in in the Ring of Fire region of Ontario. | $37,100,000 | 2019-04-04 | Detailed Design and Construction | 2020-09-30 |
Ontario | Minahico | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in six communities in the Kenora and Rainy River region of Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2020-09-30 |
Ontario | Mohawks of the Bay of Quinte | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-11-12 |
Ontario | Musky Bay | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communites in southeastern Manitoba and northwestern Ontario. | $7,908,968 | 2019-01-01 | Operational | 2020-06-30 |
Ontario | Neskantaga First Nation | Rapid Lynx Telecommunications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to five communities as well as a last mile network in the Matawa first Nation communities in in the Ring of Fire region of Ontario. | $37,100,000 | 2019-04-04 | Planning | 2021-03-31 |
Ontario | Nigigoonsiminikaaning First Nation | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in six communities in the Kenora and Rainy River region of Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2020-09-30 |
Ontario | Parry Island (Wasauksing First Nation) | Wasauksing First Nation | Backbone network and last mile network using fibre optic technology to enhance broadband capacity in two communities and reach underserved households to the Wasauksing First Nation community, Ontario. | $1,027,936 | 2017-08-01 | Operational | 2019-03-31 |
Ontario | Peawanuck (Weenusk) | Keewaytinook Okimakanak | Backbone network using satellite technology to enhance broadband capacity to two communities in the region of Northwestern Ontario. | $5,629,990 | 2018-09-01 | Operational | 2019-03-31 |
Ontario | Queensborough | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-12 |
Ontario | Read | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Detailed Design and Construction | 2021-04-20 |
Ontario | Red Rock | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in one community in the Thunder Bay region in Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2019-06-30 |
Ontario | Roblin | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Sailors Encampment | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in three communities in northwestern Ontario. | $7,908,968 | 2019-01-01 | Operational | 2020-06-30 |
Ontario | Sandhurst Shores | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-11-12 |
Ontario | Shannonville | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-11-12 |
Ontario | St. Charles | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to two communites in southeastern Manitoba and northwestern Ontario. | $7,908,968 | 2019-01-01 | Operational | 2020-06-30 |
Ontario | Stockdale | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Strathcona | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Stratton | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity in six communities in the Kenora and Rainy River region of Ontario. | $7,908,968 | 2019-01-01 | Detailed Design and Construction | 2020-09-30 |
Ontario | Summer Beaver (Nibinamik First Nation) | Rapid Lynx Telecommunications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to five communities as well as a last mile network in the Matawa first Nation communities in in the Ring of Fire region of Ontario. | $37,100,000 | 2019-04-04 | Planning | 2021-03-31 |
Ontario | Thomasburg | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-04-20 |
Ontario | Twelve O'Clock Point | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Planning | 2021-07-09 |
Ontario | Udora | The Regional Municipality of York | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the York region of Ontario. | $2,000,000 | 2019-05-31 | Planning | 2021-12-31 |
Ontario | Wallbridge | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Detailed Design and Construction | 2021-04-20 |
Ontario | Webequie | Rapid Lynx Telecommunications | Backbone and last mile network using fibre optic technology to enhance broadband capacity to five communities as well as a last mile network in the Matawa first Nation communities in in the Ring of Fire region of Ontario. | $37,100,000 | 2019-04-04 | Planning | 2020-12-31 |
Ontario | Zion Hill | Xplornet Communications Inc. | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Quinte region of Ontario. | $10,779,826 | 2018-10-01 | Detailed Design and Construction | 2021-04-20 |
Prince Edward Island | Cap-Egmont | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Prince County, Prince Edward Island. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Prince Edward Island | Indian River | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Prince County, Prince Edward Island. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Prince Edward Island | Malpeque | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Prince County, Prince Edward Island. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Prince Edward Island | Spring Valley | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Prince County, Prince Edward Island. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Prince Edward Island | St. Chrysostome | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Prince County, Prince Edward Island. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Prince Edward Island | St-Raphaël | Eastlink | Backbone network using fibre optic technology to enhance broadband capacity to three communities in Prince County, Prince Edward Island. | $1,649,454 | 2018-11-21 | Detailed Design and Construction | 2020-06-30 |
Prince Edward Island | Union Road | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in Queens County, Prince Edward Island. | $27,241,450 | 2017-05-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Albertville | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Alcove | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Armstrong | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Athelstan | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-09-30 |
Quebec | Aumond | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Baie-des-Brises | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-12-31 |
Quebec | Baie-des-Sables | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Baie-Laperrière | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to one communty in the Abitibi-Témiscamingue region of Québec. | $354,408 | 2018-07-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Baie-Saint-Ludger | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-09-30 |
Quebec | Baldwin Mills | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | Barrington | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-03-31 |
Quebec | Bassin | DUCLOS & MICHAUD TÉLÉCOM INC. | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and underserved households in the region of Îles-de-la-Madeleine, Québec. | $1,061,482 | 2017-11-17 | Detailed Design and Construction | 2020-06-30 |
Quebec | Black Cape | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Boileau | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2021-12-31 |
Quebec | Bois-Franc | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Boudreau-Corners | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | Boulogne | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Boynton | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | Bras-d'Apic | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Brigham | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Quebec | Broadlands | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Buckingham | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2022-09-30 |
Quebec | Cacouna-Sud | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Calumet | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-06-30 |
Quebec | Cap-au-Renard | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Cap-aux-Corbeaux | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Caps-de-Maria | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Cap-Seize | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Carillon | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-06-30 |
Quebec | Cawood | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Chandler-Ouest | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Chapeau | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Chichester | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Chute-Saint-Philippe | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Clapperton | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Clément | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Clemville | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Colombier | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Comins Mills | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | Cookshire | Transvision (Cookshire) inc. | Backbone network using fibre optic technology to provide resiliency broadband to two communities between Lennoxville and Cookshire in the region of Estrie, Québec. | $262,800 | 2017-09-15 | Detailed Design and Construction | 2019-09-30 |
Quebec | Couturier | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Cushing | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-12-31 |
Quebec | Dalesville | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-03-31 |
Quebec | Dalhousie | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Danby | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Danford Lake | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Denison Mills | Cogeco Connexion Inc. | Backbone and last mile network using fibre optic and cable technology to enhance broadband capacity and reach partially served households in one community in the Estrie region of Québec. | $743,604 | 2018-10-01 | Planning | 2020-12-31 |
Quebec | Dewittville | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Dimock Creek (Micmacs of Gesgapegiag) | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Domaine-de-la-Paix | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Dufaultville | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Dundee | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Dune-du-Sud | DUCLOS & MICHAUD TÉLÉCOM INC. | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and underserved households in the region of Îles-de-la-Madeleine, Québec. | $1,061,482 | 2017-11-17 | Detailed Design and Construction | 2020-03-31 |
Quebec | Earlstown | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | East Farnham | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Egan-Sud | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Estérel | Cogeco Connexion Inc. | Backbone network using fibre optic technology to enhance broadband capacity to two communies in the Laurentian region of Québec. | $78,029 | 2018-06-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Fairfax | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | Fassett | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-12-31 |
Quebec | Ferland | Municipalité de Ferland-et-Boilleau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of Saguenay-Lac Saint-Jean, Québec. | $402,081 | 2019-04-01 | Planning | 2021-03-31 |
Quebec | Ferme-Neuve | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Glen Almond | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Glen Sutton | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Planning | 2021-03-31 |
Quebec | Glenelm | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Grace Park | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Planning | 2020-12-31 |
Quebec | Grande-Cascapédia | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Grande-Vallée-des-Monts | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Grand-Pabos | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Grand-Remous | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Grenville | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Planning | 2020-12-31 |
Quebec | Grenville | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-12-31 |
Quebec | Gros-Morne | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Grosses-Roches | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Harrington Harbour | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Planning | 2021-03-31 |
Quebec | Havelock | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-06-30 |
Quebec | Havre-Aubert | DUCLOS & MICHAUD TÉLÉCOM INC. | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and underserved households in the region of Îles-de-la-Madeleine, Québec. | $1,061,482 | 2017-11-17 | Detailed Design and Construction | 2020-06-30 |
Quebec | Henrysburg | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-09-30 |
Quebec | Hollow Glen | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Honfleur | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Howick | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Inukjuak | Tamaani Internet | Backbone and last mile network using fibre optic and microwave technology to enhance broadband capacity to underserved households and four Nunavik communities located along the east coast of Hudson Bay in Québec. | $62,594,000 | 2018-04-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Issoudun | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Jean-Noël | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Jogues | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Kegaska | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-12-31 |
Quebec | Kelly | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Kensington | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Kiamika | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Kingsbury | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Kuujjuaq | Tamaani Internet | Backbone and last mile network using fibre optic and microwave technology to enhance broadband capacity to underserved households and four Nunavik communities located along the east coast of Hudson Bay in Québec. | $62,594,000 | 2018-04-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Kuujjuarapik | Tamaani Internet | Backbone and last mile network using fibre optic and microwave technology to enhance broadband capacity to underserved households and four Nunavik communities located along the east coast of Hudson Bay in Québec. | $62,594,000 | 2018-04-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | La Martre | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | La Minerve | APTR | Backbone and last mile network using fibre optic technology to improve broadband capacity in three communities and partially served households in the Laurentides region of Québec. | $2,001,982 | 2018-06-01 | Detailed Design and Construction | 2019-09-30 |
Quebec | La Normandie | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | La Petite-France | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | La Rédemption | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | La Rivière | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | La Romaine (Montagnais de Unamen Shipu) | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Planning | 2021-03-31 |
Quebec | La Tabatière | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Planning | 2021-03-31 |
Quebec | La Trinité-des-Monts | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | L'Abattis | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Labelle | APTR | Backbone and last mile network using fibre optic technology to improve broadband capacity in three communities and partially served households in the Laurentides region of Québec. | $2,001,982 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Lac-à-Beauce | Solutions Ambra inc. | Backbone network using fibre optic and microwave technology to enhance broadband capacity in seven communities in central Québec. Includes a last mile network using fixed and mobile wireless technology to reach partially served households in central Québec. | $13,031,955 | 2018-10-01 | Planning | 2020-12-31 |
Quebec | Lac-à-Foin | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Lac-Alain | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Lac-Blanc | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Lac-Cayamant | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Lac-des-Écorces | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Lac-des-Seize-Îles | Cogeco Connexion Inc. | Backbone network using fibre optic technology to enhance broadband capacity to two communies in the Laurentian region of Québec. | $78,029 | 2018-06-01 | Operational | 2019-03-31 |
Quebec | Lac-du-Milieu | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Lac-Fortin | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Lac-Humqui | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Lac-Keatley | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-06-30 |
Quebec | Lac-Labelle | APTR | Backbone and last mile network using fibre optic technology to improve broadband capacity in three communities and partially served households in the Laurentides region of Québec. | $2,001,982 | 2018-06-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Lac-Pemichangan | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Lac-Saguay | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Lac-Saint-Paul | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Lac-Selby | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Lac-Trois-Saumons | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Lac-William | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Lakeview | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-06-30 |
Quebec | L'Alverne | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | L'Annonciation | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | L'Anse-à-la-Croix | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | L'Anse-Pleureuse | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | L'Anse-Saint-Jean | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Lascelles | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2021-03-31 |
Quebec | L'Ascension | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | L'Avenir | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Le Boom | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Le Petit-Saint-Marcellin | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Lennoxville | Transvision (Cookshire) inc. | Backbone network using fibre optic technology to provide resiliency broadband to two communities between Lennoxville and Cookshire in the region of Estrie, Québec. | $262,800 | 2017-09-15 | Planning | 2020-12-31 |
Quebec | Les Buissons | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-09-30 |
Quebec | Les Côtes-du-Portage | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Les Fonds | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Les Hauteurs-de-Rimouski | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Les Îlets-Jérémie | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Les Islets-Caribou | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-09-30 |
Quebec | Les Quarante | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | L'Immaculée-Conception | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Lost River | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-09-30 |
Quebec | Louisa | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-09-30 |
Quebec | Lourdes-de-Blanc-Sablon | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Detailed Design and Construction | 2019-09-30 |
Quebec | Louvicourt | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to three communies in the Abitibi-Témiscamingue region of Québec. | $354,408 | 2018-07-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Low | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Madeleine-Centre | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Magog | CÂBLE AXION | Backbone network using fibre optic technology to provide resiliency broadband to two communities in the Estrie region of Québec. | $119,000 | 2018-07-01 | Detailed Design and Construction | 2020-12-31 |
Quebec | Maillard | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Manche-d'Épée | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Mann | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Mann Settlement | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Mansonville | CÂBLE AXION | Backbone network using fibre optic technology to provide resiliency broadband to two communities in the Estrie region of Québec. | $119,000 | 2018-07-01 | Detailed Design and Construction | 2020-12-31 |
Quebec | Martin | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Mayo | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2020-12-31 |
Quebec | Melboro | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Mille-Isles | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-12-31 |
Quebec | Moffet | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to one communty in the Abitibi-Témiscamingue region of Québec. | $354,408 | 2018-07-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Montcerf-Lytton | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Mont-Laurier | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Montpellier | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2022-12-31 |
Quebec | Mont-Saint-Michel | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Mont-Saint-Pierre | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Mont-Saint-Pierre | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Morigeau | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Murdochville | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Mutton Bay | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Planning | 2021-03-31 |
Quebec | Namur | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2022-12-31 |
Quebec | Natashquan | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-12-31 |
Quebec | Nation Anishnabe du Lac Simon | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to three communies in the Abitibi-Témiscamingue region of Québec. | $354,408 | 2018-07-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Neilon | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | New Carlisle West | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | New Richmond | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Newport-Ouest | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Nominingue | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Notre-Dame-de-Pontmain | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Notre-Dame-de-Stanbridge | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2019-03-31 |
Quebec | Notre-Dame-du-Laus | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Obaska | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to three communies in the Abitibi-Témiscamingue region of Québec. | $354,408 | 2018-07-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Old-Harry | DUCLOS & MICHAUD TÉLÉCOM INC. | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and underserved households in the region of Îles-de-la-Madeleine, Québec. | $1,061,482 | 2017-11-17 | Detailed Design and Construction | 2020-03-31 |
Quebec | Padoue | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Papineauville | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Planning | 2020-12-31 |
Quebec | Papineauville | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2021-09-30 |
Quebec | Paspébiac-Est | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Petite-Vallée | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Petit-Poisson-Blanc | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Pied-du-Lac | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Pine Hill | MRC ARGENTEUIL | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households in the Laurentides region of Québec. | $4,652,355 | 2018-06-30 | Detailed Design and Construction | 2020-09-30 |
Quebec | Pinguet | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Plage-Baie-Noire | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Plage-Somerville | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-03-31 |
Quebec | Pointe-à-la-Garde | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Pointe-au-Chêne | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-12-31 |
Quebec | Pointe-aux-Anglais | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Pointe-aux-Loups | DUCLOS & MICHAUD TÉLÉCOM INC. | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and underserved households in the region of Îles-de-la-Madeleine, Québec. | $1,061,482 | 2017-11-17 | Detailed Design and Construction | 2019-12-31 |
Quebec | Pointe-aux-Outardes | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-09-30 |
Quebec | Pointe-Biron | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-09-30 |
Quebec | Pointe-des-Monts | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-09-30 |
Quebec | Pointe-Leggatt | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Port Lewis | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-09-30 |
Quebec | Port-Daniel | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Port-Daniel-Ouest | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Poste-des-Villeneuve | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Projet-Laplante | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-06-30 |
Quebec | Proulxville | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Puvirnituq | Tamaani Internet | Backbone and last mile network using fibre optic and microwave technology to enhance broadband capacity to underserved households and four Nunavik communities located along the east coast of Hudson Bay in Québec. | $62,594,000 | 2018-04-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Querry | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Rapides-des-Joachims | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Rémigny | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Abitibi-Témiscamingue region of Québec. | $354,408 | 2018-07-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Ripon | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2021-09-30 |
Quebec | Rivière-Bonaventure | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Rivière-Caplan | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Rivière-Lafleur | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Rivière-la-Madeleine | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Rivière-Matane | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Rivière-Port-Daniel | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Rivière-Saint-Paul | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Detailed Design and Construction | 2019-09-30 |
Quebec | Robidoux | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Robitaille | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Rockburn | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-09-30 |
Quebec | Roquemaure | Cablevision | Backbone network using fibre optic technology to enhance broadband capacity to two communities in the Abitibi-Témiscamingue (Abitibi-Ouest) region of Québec. |
$354,408 | 2018-07-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Rousseau | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Ruisseau-à-la-Loutre | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Ruisseau-à-Rebours | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Ruisseau-Castor | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Ruisseau-des-Olives | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Ruisseau-Gagnon | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Ruisseau-Leblanc | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Ruisseau-Vert | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-09-30 |
Quebec | Runnymede | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Russeltown Flats | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Adalbert | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Adélard | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Adelme | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Aimé-du-Lac-des-Îles | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Alexandre-de-Kamouraska | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Saint-Alexandre-des-Lacs | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Ambroise | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Saint-Ambroise | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-André-Avellin | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2021-09-30 |
Quebec | Saint-André-de-Restigouche | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Anicet | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2019-06-30 |
Quebec | Saint-Antoine-de-Tilly | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Armand | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2019-06-30 |
Quebec | Saint-Augustin | TELUS | Backbone network using fibre optic and microwave technology to enhance broadband capacity to seven communities along the north shore of the Gulf of St. Lawrence in Québec. Includes a last mile network using fixed wireless technology to reach unserved households in the area. | $9,294,854 | 2018-11-01 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Blaise-sur-Richelieu | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Charles | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Saint-Charles-Garnier | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Cléophas | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Damase | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Damase-des-Aulnaies | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-David-de-Falardeau | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Sainte-Agathe-de-Lotbinière | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Sainte-Agnès-de-Dundee | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Sainte-Anne-du-Lac | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Sainte-Apolline | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Sainte-Barbe | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Sainte-Clotilde-de-Beauce | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Edgar | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Edmond-de-Grantham | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Saint-Édouard | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Sainte-Euphémie | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Sainte-Famille | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Sainte-Félicité | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Sainte-Félicité | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Sainte-Florence | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Sainte-Irène | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Sainte-Jeanne-d'Arc | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Sainte-Jeanne-d'Arc | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Sainte-Marguerite-Marie | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Sainte-Paule | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Sainte-Rose-du-Nord | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Sainte-Rose-du-Nord | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Sainte-Sabine | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Étienne-de-Beauharnois | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Eugène-de-Grantham | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Saint-Eugène-de-Ladrière | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Sainte-Véronique | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-François | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-François-de-Pabos | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Gabriel-de-Rimouski | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Germain | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-Godefroi | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Honoré | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-Ignace-de-Stanbridge | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Isidore-de-Gaspé | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Jean-de-Cherbourg | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Jean-de-Matapédia | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Jean-sur-le-Lac | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Jogues | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Jogues-Sud | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Léandre | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Luc-de-Matane | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Luc-de-Vincennes | Cogeco Connexion Inc. | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Mauricie region of Québec. | $78,029 | 2018-06-01 | Detailed Design and Construction | 2019-03-31 |
Quebec | Saint-Marc-de-Latour | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Saint-Marcel | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Michel-de-Bellechasse | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Noël | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Octave-de-Métis | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Omer | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Saint-Pacôme | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-Philémon-Sud | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Philippe | DÉRYtélécom | Backbone network using fibre optic technology to enhance broadband capacity to eight communities in the Outaouais and the Laurentians region in Québec. | $294,392 | 2018-10-29 | Detailed Design and Construction | 2020-06-30 |
Quebec | Saint-Philippe-de-Néri | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-Pierre-de-l'Île-d'Orléans | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-Placide | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Saint-René | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-René-de-Matane | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Siméon-de-Bonaventure | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Sixte | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2020-12-31 |
Quebec | Saint-Stanislas-de-Kostka | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2020-12-31 |
Quebec | Saint-Tharcisius | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Tite-des-Caps | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Saint-Valentin | TARGO Communications Inc | Backbone and last mile network using fibre optic technology to enhance broadband capacity to 23 communities and reach underserved households in the Montérégie region in the province of Québec. | $2,399,424 | 2018-01-05 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Vianney | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2021-03-31 |
Quebec | Saint-Victor-de-Bonaventure | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Saint-Yvon | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-12-31 |
Quebec | Salaberry | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Sheenboro | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Shigawake | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Shigawake-Est | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Tartigou | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-06-30 |
Quebec | Thivierge | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2019-09-30 |
Quebec | Thurso | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2022-09-30 |
Quebec | Umiujaq | Tamaani Internet | Backbone and last mile network using fibre optic and microwave technology to enhance broadband capacity to underserved households and four Nunavik communities located along the east coast of Hudson Bay in Québec. | $62,594,000 | 2018-04-01 | Detailed Design and Construction | 2019-12-31 |
Quebec | Val-Barrette | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Val-des-Bois (Lac Vert) | Municipalité régionale de comté de Papineau | Backbone and last mile network using fibre optic technology to enhance broadband capacity to two municipalities and underserved households in the region of the Laurentides — Outaouais in Québec. | $3,247,465 | 2018-10-01 | Planning | 2020-12-31 |
Quebec | Val-d'Irène | TELUS | Backbone network using fibre optic technology to enhance broadband capacity in 141 communities and a last mile network using fibre optic technology to reach partially served households in the Québec City region | $12,111,784 | 2017-11-20 | Detailed Design and Construction | 2020-03-31 |
Quebec | Village-de-la-Blague | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Villette | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | Wabassee | Municipalité régionale de comté d'Antoine-Labelle | Backbone network using fibre optic technology to enhance broadband capacity to 20 communities in the Outaouais (Antoine-Labelle) region of Québec. | $958,962 | 2018-05-22 | Detailed Design and Construction | 2020-06-30 |
Quebec | Waltham | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Quebec | Way's Mills | TACTIC | Backbone and last mile network using fibre optic technology to enhance broadband capacity to eight communities and reach underserved households of the Municipalité Régionale de Comté (MRC) de Coaticook region of Québec. | $3,254,076 | 2019-02-26 | Detailed Design and Construction | 2020-06-30 |
Quebec | West Brome | Internet Haut-Richelieu | Backbone and last mile network to improve broadband capacity in 11 communities and households in the Montérégie region of Québec. | $8,115,780 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Quebec | Wheatland | CoopTel | Backbone network using fibre optic technology to enhance broadband capacity in 11 communities in the Montérégie and Estrie regions in central Québec. | $554,000 | 2018-04-01 | Detailed Design and Construction | 2020-09-30 |
Quebec | Wilson's Corner | Bell Canada | Backbone network using fibre optic technology to enhance broadband capacity to one community in the Saguenay — Lac-Saint-Jean region in Québec. | $7,001,866 | 2018-03-01 | Planning | 2020-12-31 |
Saskatchewan | Abbey | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Admiral | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Amazon | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Arlington Beach | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Balone Beach | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Beauval | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Planning | 2021-03-31 |
Saskatchewan | Berard Beach | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Blumenheim | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Blumenthal | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Bradwell | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Brock | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Burstall | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Cabri | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Cadillac | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Climax | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Colesdale Park | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Consul | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Crystal Springs | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Denzil | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Domremy Beach | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Eastend | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Eston | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Etters Beach | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Fox Valley | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Glen Harbour | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Greenfeld | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Gruenthal | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Hagen | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Imperial | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-06-30 |
Saskatchewan | Island View | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Kannata Valley | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Kelvington | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Kipling | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-09-30 |
Saskatchewan | Kyle | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-09-30 |
Saskatchewan | Leader | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Maple Creek | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Milestone | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Mohr's Beach | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Netherhill | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-12-31 |
Saskatchewan | Neuhorst | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Nikorick Beach | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | North Colesdale Park | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Pelican Pointe | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Ponteix | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-03-31 |
Saskatchewan | Renown | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Richmound | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2020-06-30 |
Saskatchewan | Riversedge | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Shaunavon | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-12-31 |
Saskatchewan | Shields | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Simpson | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Sorenson's Beach | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Southey | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-09-30 |
Saskatchewan | Spring Bay | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Thode | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Tway | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Uhl's Bay | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2020-12-31 |
Saskatchewan | Venn | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Vibank | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-09-30 |
Saskatchewan | Wakaw Lake | FlexNetworks | Backbone network using fibre optic technology to enhance broadband capacity to 14 communities in the region of Saskatoon — Prince Albert, Saskatchewan. | $5,939,449 | 2018-04-23 | Detailed Design and Construction | 2020-09-30 |
Saskatchewan | Waterpark Estates | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Planning | 2021-12-31 |
Saskatchewan | Watrous | Saskatchewan Telecommunications | Backbone network using fibre optic technology to enhance broadband capacity to 27 communities in the southern region of Saskatchewan. | $6,539,336 | 2018-05-01 | Detailed Design and Construction | 2019-06-30 |
Saskatchewan | Zelma | FlexNetworks | Backbone network using fibre optic and microwave technologies to enhance broadband capacity to 21 communities in Last Mountain Lake and surrounding areas of Saskatchewan. | $10,159,371 | 2019-07-02 | Detailed Design and Construction | 2020-09-30 |
Yukon | Dawson (Tr'ondëk Hwëch'in) | Government of Yukon | Backbone network using fibre optic technology to enhance broadband resiliency to four communities in the Northwest Territories and Yukon. | $30,000,000 | 2018-06-01 | Detailed Design and Construction | 2021-03-31 |