Language selection

Search

Patent 2822927 Summary

Third-party information liability

Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Users wishing to rely upon this information should consult directly with the source of the information. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.

Claims and Abstract availability

Any discrepancies in the text and image of the Claims and Abstract are due to differing posting times. Text of the Claims and Abstract are posted:

  • At the time the application is open to public inspection;
  • At the time of issue of the patent (grant).
(12) Patent Application: (11) CA 2822927
(54) English Title: METHOD FOR TREATING PRODUCED WATER OF FRACKING OPERATIONS
(54) French Title: METHODE DE TRAITEMENT D'EAU PRODUITE PROVENANT DES OPERATIONS DE FRACTURATION HYDRAULIQUE
Status: Deemed Abandoned and Beyond the Period of Reinstatement - Pending Response to Notice of Disregarded Communication
Bibliographic Data
Abstracts

English Abstract


THIS INVENTION IS OF A MOBILE WATER PROCESSING SYSTEM CALLED THE FRAC
VAP
USED FOR THE OIL AND NATURAL GAS HYDAULIC FRACKING INDUSTRY THIS
SYSTEM CLEANS ,STRAINS AND REMOVES ANY SOLUABLE AND INSOLUABLE
CONTANIMENTS IN THE WATER .DOWN TO 1 MICRON IN SIZE . IT FRAC VAP
SYSTEM WAS DESIGNED TO COME RIGHT TO THE WELL SITES AND PROCESS THE
WATER THERE .THIS EQUIPTMENT WILL ELIMINATE COUNTLESS TRUCKING TRIPS
HAULING WATER BACK AND FORTH DRAST8ICALLY CUT DOWN ON THE NEED OF
FRESH WATER THIS IS A 9 PART WATER CLEANING AND SEPORATING SYSTEM
THAT ALSO WILL WITH A SPECIALLY DESIGNED WATER TOWER ,COLLECT ANY
REMAINING CHEMICALS IN A CATCH PAN FOR EASILY REMOVAL , THIS IS A VERY
UNIQUIE SYSTEM THAT ENSURES THAT ALL THE CHEMICALS IN THE WATER ARE
SEPORATED OUT .IT WILL ELIMINATE A LOT OF COSTS CONNECTED TO THE OIL
AND GAS FRACKING INDUSTRY . AND A BIG BENIFIT FOR THE ENVIROMENT . AS
THE PROCESS WATER WILL NOT BE NEEDED TO BE TRUCKED ANY WHERE FOR
PROCESSING AS IT GETS PROCESSED RIGHT ON SITE . OR THE WATER CAN BE
MIXED WITH USED FRAC WATER AND USED FOR REINJECTION OR INSTALLED
BACK INTO THE ENVIROMENT NATURALY IN A VAPOR FORM . THIS SYSEMM
REMOVALS ALL HARM FULL IMPURITIES FROM THE WATER IN A MECHANICAL
SEPORATING FORM .WHEN THE FRACKING PROCEDURE IS COMPLETED WITH
MINIMALLL COST TO NO ONE .


Claims

Note: Claims are shown in the official language in which they were submitted.

Sorry, the claims for patent document number 2822927 were not found.
Text is not available for all patent documents. The current dates of coverage are on the Currency of Information  page

Description

Note: Descriptions are shown in the official language in which they were submitted.


CA 02822927 2013-08-05
=
=
AFTER A FLEX LINE IS CONNECTED ONTO THE WATER FRACKING CONTAINMENT
TANK ( 1 ) THE FLUIDS ARE THEN PUMPED WITH A CIRCULATING PUMP ( 2 ) TO A
CYCLONE DE-SANDER UNIT ( 3 ) AT RATE OF 300 GALLONS PER MINUITE AND A
PRESSURE OF 75 PSI .THE DE-SANDER WITH A CYCLONIC ACTION WILL SEPORATE
THE SOLIDS OUT IN EXCESS OF 25 MICRONS , THE FLUIDS THEN ENTERS A
D-SILTER ( 4) WHICH ALSO IS A CYCLONE UNIT THAT FURTHERS SEPORATES ANY
SOLIDS OUT IN EXCESSS OF 5 MICRONS IN SIZE ..NEXT THE FLUID ENTERS A SET
OF VESSELS WHICH ARE THERE TO REMOVE THE HYDROGEN SULFIDE IN LIQUID
FORM .HYDROGEN SULFIDE IN A VAPOR FORM WILL BE DRAWN OFF AND SENT
TO A HORIZONTAL VESSEL ( 6) CONTAINING ACTIVATED CHARCHOL WHICH WILL
ABSORBE THE IMPURITIES ,THE VELOCITY IN THIS VESSEL IS 90 FEET PER
MINUITE .THE CHARCHOL UNIT WILL HAVE STEAM LINE GOING TO IT ENTERING
AT THE BOTTEM AND THIS WILL REGENERATE THE CHARCHOL IN THE VESSEL.,
THE VAPOUR FROM THIS WILL GO THROUGH A VAPOR SCRUBBER UNIT ( 7).NEXT
THE FLUIDS ARE PUMPED TO AN OIL SEPORATOR ( 8) UNIT WHERE A MAXIUM
OF 10 CUBIC METERS WILL BE SEPORATED PER 24 HOURS A DAY THE OIL WILL
SENT TO A HOLDING TANK ( 9 ) FOR COLLECTION LATER . THE SEPORATROR
WORKS ON THE DIFFERANCE IN DENSITIES OF THE 2 FLUIDS .
THE FLUIDS ARE THEN PUMPED TO HOLDING TANK ( 11 ). WITH THE HELP OF
AN AGITATOR, LIQUID LIME AND LIQUID ALUMINUM ARE INJECTECTED INTO THE
MIXTURE TO HELP INCREASE THE SIZE OF THE SODIUM PARTICALS AND THE
PHOSPHATE PARTICALS FOR EASIER REMOVAL THROUGH THE FLOCKUATION
PROCESS ..
THE FLUIDS ENTER A PAIR OF LARGE CENTER FUGES WHERE FURTHER
SEPORATION TAKES PLACE WITH THESE MACHINDES ROTATING AT A SPEED OF
4150 RPM EXTRACTING OUT SOLOIDS LARGER THAN 1/2 TO 1 MICRONS. THE
SOLIDS THAT ARE EXTRACTED , EXIT THE MACHINE TO A CONVEYER BELT ( 13 )
AND REMOVES THEM. TRANSPORTING THEM TO A SHIPPING CONTAINER FOR
LATER SHIPPING .THE FLUIDS ARE THEN PUMPED TO A FINISHING DE - DILTER
( 19 ) WHICH IS THERE TO REMOVE ANY REMAINING PARTICALS WITH THE HELP
OF A CIRCULATING PUMP ( 14 ).THE FLUIDS THEN ENTER .ENTER TWO VERTICAL
FILTERS ,BOTH CONTAINING ACTIVATED CHARCHOL ( 17 ) & ( 16) THESE
CHARCHOL FILTERS ARE THERE TO REMOVE ANY RADIO ACTIVE MATERIAL
( NORMS ) ANY HYDROCARBONS AND ANY HYDROGEN SULFIDE LEFT IN THE
WATER. THE CHARBON IS REGENERATED WITH THE HELP OF A REGENERATION
FURNACE ( 18 ) WHICH IS PART OF THE UNIT
THE FLUIDS ARE THEN AT A CLEAN AND POLISHED STATE AND CAN BE SENT TO
ONE OF TWO DIRECTIONS . FIRST THEY CAN BE PUMPED TO A HOLDING TANK
( 20 ) TO BE USED AGAIN IN THE FRACKING PROCESSS .
THE FLUIDS CAN ALSO BE SENT TO BE DISPERSED IN THE ENVIROMENT IN A
NATRURAL FORM ,( VAPOR) THE FLUUIDS WILL BE SENT THROUGH A PLATE FIN
HEAT EXCHANGER ( 21 ) WHERE THEY PICK UP THE HEAT FROM THE 75 HORSE
POWER BOILER ( 22 ) THEY ARE HEATED TO A TEMPERATURE OF 175 FARANHIET .
THE FLUIDS THEN GO TO A WATER TOWER. ( 23 ) THE FUIDS ENTER TO TOWER AT
THE TOP AND WITH THE ELIVATED TEMPERATURE OF THE TOWER WATER THE
WATER WILL TURN TO A STATE OF VAPOR .WHEN THIS TAKES PLACE ANY CHEM
ICALS OR IMPURITIES LEFT V IN THE WATER WILL BE LEFT BEHIND IN THE
TOWER AS A SOLID ON THE TOWER TUBES. THE TOWER TUBES ARE MADE FROM
A FLEXIBLE METALS SO AFTER A DRYING TIME HAS ENDED A MODULATING

CA 02822927 2013-08-05
MOTOR ( 24 ) CONNECTEC TO THE TOWER TUBES AND WILL BEND THE TUBES UP
AND DOWN SLOWLY CRACKING THE CHEMICAL COATING SO THEY WILL THEN
FALL DOWN TO A COLLECTION PAN FOR REMOVAL LATER.
THE FLUIDS ARE THEN IN A VAPOR FORM AND WITH THE HELP OF A FORCED
AIR FLOW AND A FAN THE WATER VAPOR IS SENT UP INTO THE AIR IN A CLEAN
AND NATURAL FORM.
THE END RESULTS ARE THE FLOW BACK FLUIDS ARE TURNED FROM A
HARMFULL WASTE TO A CLEAN AND POLISHED USABLE WATER.

CA 02822927 2013-08-05
AFTER A FLEX LINE IS CONNECTED ONTO THE WATER FRACKING CONTAINMENT
TANK ( 1 ) THE FLUIDS ARE THEN PUMPED WITH A CIRCULATING PUMP ( 2 ) TO A
CYCLONE DE-SANDER UNIT ( 3 ) AT RATE OF 300 GALLONS PER MINUITE AND A
PRESSURE OF 75 PSI .THE DE-SANDER WITH A CYCLONIC ACTION WILL SEPORATE
THE SOLIDS OUT IN EXCESS OF 25 MICRONS , THE FLUIDS THEN ENTERS A
D-SILTER ( 4) WHICH ALSO IS A CYCLONE UNIT THAT FURTHERS SEPORATES ANY
SOLIDS OUT IN EXCESSS OF 5 MICRONS IN SIZE ..NEXT THE FLUID ENTERS A SET
OF VESSELS WHICH ARE THERE TO REMOVE THE HYDROGEN SULFIDE IN LIQUID
FORM .HYDROGEN SULFIDE IN A VAPOR FORM WILL BE DRAWN OFF AND SENT
TO A HORIZONTAL VESSEL ( 6) CONTAINING ACTIVATED CHARCHOL WHICH WILL
ABSORBE THE IMPURITIES ,THE VELOCITY IN THIS VESSEL IS 90 FEET PER
MINUITE .THE CHARCHOL UNIT WILL HAVE STEAM LINE GOING TO IT ENTERING
AT THE BOTTEM AND THIS WILL REGENERATE THE CHARCHOL IN THE VESSEL.,
THE VAPOUR FROM THIS WILL GO THROUGH A VAPOR SCRUBBER UNIT ( 7).NEXT
THE FLUIDS ARE PUMPED TO AN OIL SEPORATOR ( 8) UNIT WHERE A MAXIUM
OF 10 CUBIC METERS WILL BE SEPORATED PER 24 HOURS A DAY ., THE OIL WILL
SENT TO A HOLDING TANK ( 9 ) FOR COLLECTION LATER. THE SEPORATROR
WORKS ON THE DIFFERANCE IN DENSITIES OF THE 2 FLUIDS .
THE FLUIDS ARE THEN PUMPED TO HOLDING TANK ( 11). WITH THE HELP OF
AN AGITATOR, LIQUID LIME AND LIQUID ALUMINUM ARE INJECTECTED INTO THE
MIXTURE TO HELP INCREASE THE SIZE OF THE SODIUM PARTICALS AND THE
PHOSPHATE PARTICALS FOR EASIER REMOVAL THROUGH THE FLOCKUATION
PROCESS..
THE FLUIDS ENTER A PAIR OF LARGE CENTER FUGES WHERE FURTHER
SEPORATION TAKES PLACE WITH THESE MACHINDES ROTATING AT A SPEED OF
4150 RPM EXTRACTING OUT SOLOIDS LARGER THAN 1/2 TO 1 MICRONS. THE
SOLIDS THAT ARE EXTRACTED , EXIT THE MACHINE TO A CONVEYER BELT ( 13 )
AND REMOVES THEM. TRANSPORTING THEM TO A SHIPPING CONTAINER FOR
LATER SHIPPING .THE FLUIDS ARE THEN PUMPED TO A FINISHING DE - DILTER
( 19 ) WHICH IS THERE TO REMOVE ANY REMAINING PARTICALS WITH THE HELP
OF A CIRCULATING PUMP ( 14 ).THE FLUIDS THEN ENTER .ENTER TWO VERTICAL
FILTERS ,BOTH CONTAINING ACTIVATED CHARCHOL ( 17 ) & ( 16 ) THESE
CHARCHOL FILTERS ARE THERE TO REMOVE ANY RADIO ACTIVE MATERIAL
( NORMS ) ANY HYDROCARBONS AND ANY HYDROGEN SULFIDE LEFT IN THE
WATER. THE CHARBON IS REGENERATED WITH THE HELP OF A REGENERATION
FURNACE ( 18 ) WHICH IS PART OF THE UNIT
THE FLUIDS ARE THEN AT A CLEAN AND POLISHED STATE AND CAN BE SENT TO
ONE OF TWO DIRECTIONS . FIRST THEY CAN BE PUMPED TO A HOLDING TANK
( 20 ) TO BE USED AGAIN IN THE FRACKING PROCESSS .
THE FLUIDS CAN ALSO BE SENT TO BE DISPERSED IN THE ENVIROMENT IN A
NATRURAL FORM ,( VAPOR) THE FLUUIDS WILL BE SENT THROUGH A PLATE FIN
HEAT EXCHANGER ( 21 ) WHERE THEY PICK UP THE HEAT FROM THE 75 HORSE
POWER BOILER ( 22 ) THEY ARE HEATED TO A TEMPERATURE OF 175 FARANHIET .
THE FLUIDS THEN GO TO A WATER TOWER. ( 23 ) THE FUIDS ENTER TO TOWER AT
THE TOP AND WITH THE ELIVATED TEMPERATURE OF THE TOWER WATER ,THE
WATER WILL TURN TO A VAPOR STATE .WHEN THIS TAKES PLACE ANY CHEM
ICALS OR IMPURITIES LEFT IN THE WATER WILL REMAIN BEHIND IN THE WATER
TOWER ( 23 ) AS A SOLID ON THE TOWER .TUBES. THE TOWER TUBES ARE
NORMALY MADE FROM THICK ONE INCH STEEL PIPES WITH A HEAVY GUAGE .

CA 02822927 2013-08-05
THIS WATER TOWER IS DESIGNED WITH FLEXIBLE METAL PIPES SO THE
CHEMICALS LEFT BEHIND ON THESE CAN BE EASILY EXTRACTED . AFTER A
PREDETERMINED TIME INTRAVAL THE WATER FLOW TO THE TOWER WILL STOP
AND THE AIR SUPPLY TO THE TOWER CONTINUES TO DRY THE CHEMICALS ON
THE TUBES. THEN AGAIN AT A PREDETERMINED TIME A MODULATING MOTOR ( 24
)CONNECTED WITH A STEEL ARM . BRINGS THE WATER TOWER PIPES UP AND
DOWN ABOUT 4 INCHEAS IN EACH DIRECTION SLOWLY ,THIS ALLOWS THE
CHEMICAL COATING ON THE PIPES TO CRACK AND FALL OFF . THEY FALL DOWN
TO A CATCH SCEEN AT THE BOTTEM OF THE TOWER FOR EASILY REMOVAL.
AFTER THE REMOVAL STAGE IS COMPLETED THE SYSTEM RESTARSTS THE WATER
FLOW TO THE THE TOWER .
THE FLUIDS ARE THEN IN A VAPOR FORM AND WITH THE HELP OF A FORCED
AIR FLOW AND A FAN . THE WATER VAPOR IS SENT UP INTO THE AIR IN A CLEAN
AND NATURAL FORM.
THE END RESULTS ARE THE FLOW BACK FLUIDS ARE TURNED FROM A
HARMFULL WASTE TO A CLEAN AND POLISHED USABLE WATER AND DOWN TO
A LEVEL OF PURITY THAT AFTER TESTING CAN BE REINSTALLED BACK INTO
THE LAKES AND RIVERS ..

Representative Drawing
A single figure which represents the drawing illustrating the invention.
Administrative Status

2024-08-01:As part of the Next Generation Patents (NGP) transition, the Canadian Patents Database (CPD) now contains a more detailed Event History, which replicates the Event Log of our new back-office solution.

Please note that "Inactive:" events refers to events no longer in use in our new back-office solution.

For a clearer understanding of the status of the application/patent presented on this page, the site Disclaimer , as well as the definitions for Patent , Event History , Maintenance Fee  and Payment History  should be consulted.

Event History

Description Date
Inactive: IPC expired 2023-01-01
Application Not Reinstated by Deadline 2018-08-17
Inactive: Dead - No reply to s.30(2) Rules requisition 2018-08-17
Deemed Abandoned - Failure to Respond to Maintenance Fee Notice 2018-08-06
Inactive: Abandoned - No reply to s.30(2) Rules requisition 2017-08-17
Maintenance Request Received 2017-05-29
Inactive: S.30(2) Rules - Examiner requisition 2017-02-17
Letter sent 2017-01-27
Inactive: Report - No QC 2017-01-27
Letter Sent 2017-01-11
Inactive: Office letter 2017-01-10
Inactive: Office letter 2017-01-10
Revocation of Agent Requirements Determined Compliant 2017-01-10
Revocation of Agent Request 2016-12-23
Reinstatement Requirements Deemed Compliant for All Abandonment Reasons 2016-12-23
Reinstatement Request Received 2016-12-23
Inactive: Abandoned - No reply to s.30(2) Rules requisition 2016-10-26
Inactive: S.30(2) Rules - Examiner requisition 2016-07-26
Inactive: Report - QC passed 2016-07-25
Amendment Received - Voluntary Amendment 2016-06-17
Inactive: S.30(2) Rules - Examiner requisition 2016-03-18
Inactive: Report - No QC 2016-03-17
Letter Sent 2016-02-03
Letter sent 2016-02-03
Advanced Examination Determined Compliant - Green 2016-02-03
Letter Sent 2016-02-03
Request for Examination Received 2016-01-20
Request for Examination Requirements Determined Compliant 2016-01-20
All Requirements for Examination Determined Compliant 2016-01-20
Reinstatement Requirements Deemed Compliant for All Abandonment Reasons 2016-01-20
Inactive: Correspondence - Formalities 2016-01-20
Reinstatement Request Received 2016-01-20
Inactive: Compliance - PCT: Resp. Rec'd 2016-01-20
Inactive: Advanced examination (SO) 2016-01-20
Amendment Received - Voluntary Amendment 2016-01-20
Inactive: Office letter 2015-07-23
Revocation of Agent Requirements Determined Compliant 2015-07-23
Inactive: Office letter 2015-07-23
Reinstatement Request Received 2015-07-10
Revocation of Agent Request 2015-07-10
Maintenance Request Received 2015-07-10
Inactive: Office letter 2015-07-10
Inactive: Adhoc Request Documented 2015-07-10
Revocation of Agent Request 2015-07-02
Deemed Abandoned - Failure to Respond to Notice Requiring a Translation 2015-03-18
Inactive: Cover page published 2015-02-09
Application Published (Open to Public Inspection) 2015-02-05
Inactive: Incomplete 2014-12-18
Inactive: Adhoc Request Documented 2014-12-10
Inactive: First IPC assigned 2014-07-31
Inactive: IPC assigned 2014-07-31
Revocation of Agent Requirements Determined Compliant 2014-06-04
Inactive: Office letter 2014-06-04
Inactive: Office letter 2014-06-04
Revocation of Agent Request 2014-04-30
Revocation of Agent Requirements Determined Compliant 2014-03-26
Inactive: Office letter 2014-03-26
Inactive: Office letter 2014-03-26
Revocation of Agent Request 2014-03-11
Change of Address Requirements Determined Compliant 2013-12-02
Inactive: Office letter 2013-12-02
Change of Address or Method of Correspondence Request Received 2013-11-13
Inactive: IPC assigned 2013-08-29
Inactive: IPC assigned 2013-08-21
Inactive: First IPC assigned 2013-08-21
Inactive: IPC assigned 2013-08-21
Inactive: Filing certificate - No RFE (English) 2013-08-19
Inactive: Request under s.37 Rules - Non-PCT 2013-08-19
Reinstatement Requirements Deemed Compliant for All Abandonment Reasons 2013-08-19
Application Received - Regular National 2013-08-13
Small Entity Declaration Determined Compliant 2013-08-05
Inactive: Pre-classification 2013-08-05

Abandonment History

Abandonment Date Reason Reinstatement Date
2018-08-06
2016-12-23
2016-01-20
2015-07-10
2015-03-18

Maintenance Fee

The last payment was received on 2017-05-29

Note : If the full payment has not been received on or before the date indicated, a further fee may be required which may be one of the following

  • the reinstatement fee;
  • the late payment fee; or
  • additional fee to reverse deemed expiry.

Patent fees are adjusted on the 1st of January every year. The amounts above are the current amounts if received by December 31 of the current year.
Please refer to the CIPO Patent Fees web page to see all current fee amounts.

Fee History

Fee Type Anniversary Year Due Date Paid Date
Application fee - small 2013-08-05
MF (application, 2nd anniv.) - small 02 2015-08-05 2015-07-10
Request for examination - small 2016-01-20
2016-01-20
2016-01-20
MF (application, 3rd anniv.) - small 03 2016-08-05 2016-07-28
Reinstatement 2016-12-23
MF (application, 4th anniv.) - small 04 2017-08-07 2017-05-29
Owners on Record

Note: Records showing the ownership history in alphabetical order.

Current Owners on Record
GARRY BUSH
Past Owners on Record
None
Past Owners that do not appear in the "Owners on Record" listing will appear in other documentation within the application.
Documents

To view selected files, please enter reCAPTCHA code :



To view images, click a link in the Document Description column. To download the documents, select one or more checkboxes in the first column and then click the "Download Selected in PDF format (Zip Archive)" or the "Download Selected as Single PDF" button.

List of published and non-published patent-specific documents on the CPD .

If you have any difficulty accessing content, you can call the Client Service Centre at 1-866-997-1936 or send them an e-mail at CIPO Client Service Centre.


Document
Description 
Date
(yyyy-mm-dd) 
Number of pages   Size of Image (KB) 
Description 2013-08-04 4 235
Abstract 2013-08-04 1 41
Drawings 2013-08-04 2 51
Representative drawing 2015-01-07 1 8
Claims 2016-01-19 4 113
Drawings 2016-01-19 2 57
Abstract 2016-01-19 1 15
Description 2016-01-19 8 310
Claims 2016-06-16 4 115
Description 2016-06-16 8 334
Filing Certificate (English) 2013-08-18 1 156
Notice: Maintenance Fee Reminder 2015-05-05 1 119
Courtesy - Abandonment Letter (incomplete) 2015-12-06 1 164
Acknowledgement of Request for Examination 2016-02-02 1 175
Notice of Reinstatement 2016-02-02 1 168
Courtesy - Abandonment Letter (Maintenance Fee) 2018-09-16 1 174
Courtesy - Abandonment Letter (R30(2)) 2016-12-06 1 164
Notice of Reinstatement 2017-01-10 1 170
Notice: Maintenance Fee Reminder 2017-05-07 1 121
Courtesy - Abandonment Letter (R30(2)) 2017-09-27 1 164
Notice: Maintenance Fee Reminder 2018-05-07 1 119
Correspondence 2013-08-18 1 34
Correspondence 2013-08-18 1 19
Correspondence 2013-11-12 1 15
Correspondence 2013-12-01 1 13
Correspondence 2014-03-10 3 84
Correspondence 2014-03-25 1 14
Correspondence 2014-03-25 1 17
Correspondence 2014-04-29 1 18
Correspondence 2014-06-03 1 15
Correspondence 2014-06-03 1 18
Correspondence 2014-12-17 2 35
Change of agent 2015-07-01 2 54
Courtesy - Office Letter 2015-07-09 1 23
Change of agent 2015-07-09 5 152
Change of agent 2015-07-09 1 34
Correspondence 2015-07-09 3 82
Change of agent 2015-07-09 2 48
Courtesy - Office Letter 2015-07-22 1 22
Courtesy - Office Letter 2015-07-22 1 24
Correspondence 2016-01-19 8 248
Examiner Requisition 2016-03-17 3 236
Amendment / response to report 2016-06-16 19 796
Examiner Requisition 2016-07-25 4 274
Fees 2016-07-27 1 25
Amendment / response to report 2016-12-22 2 56
Change of agent 2016-12-22 2 56
Courtesy - Office Letter 2017-01-09 1 22
Courtesy - Office Letter 2017-01-09 1 31
Examiner Requisition 2017-02-16 5 309
Maintenance fee payment 2017-05-28 1 70